CIPS L6M5 - Strategic Programme Leadership LO1 Questions and Comprehensive Answers Graded A+

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
02-02-2025
Written in
2024/2025

Van Weele purchasing development model - ️️1. Transactional orientation, serve the factors - supply relationship is reactive, relationship based on provision of raw materials and components. 2. Commercial orientation, lowest unit price - relationship is based on price negotiation aimed at achieving lowest prices for the organisation. 3. Co-ordinated purchasing - procurement and supply using uniform policies, processes and systems. Often bureaucratic and slow to respond to units. 4. Internal integration cross-functional purchasing - relationship becomes more integrated. Focuses on cross functional problem solving 5. External integration: supply chain-management - Outsourcing strategies developed with supply chain partners. 6. Value chain orientation - Recognises P&S strategy needs to deliver value to the end customer, strong relationships encouraged with suppliers. EPC Contract - ️️An EPC Contract is appealing to the client as a turnkey solution and a risk mitigation tool - the EPC contractor assumes all of the responsibilities and risk of completing a programme EPC Contract vs D&B - ️️Close links between EPC and D&B contracts - the difference is that the EPC contract requires the contractor the design and construct a building to a specification where it is capable of producing a certain level of output. Mechanical completion - ️️Start up and commissioning of all systems in a building Performance Testing - ️️Demonstrates that the building is suitable for the requirements of a client Performance Testing - ️️Is important in terms of the programme as it allow the contractor to avoid LDs or claim bonuses if the programme is completed early provisional acceptance - ️️the client accepts the performance on the basis that the contractor remains responsible for finding a remedy

Show more Read less
Institution
CIPS L6M5
Course
CIPS L6M5










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CIPS L6M5
Course
CIPS L6M5

Document information

Uploaded on
February 2, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CIPS L6M5 - Strategic Programme Leadership
LO1 Questions and Comprehensive Answers
Graded A+ 2024-2025
Van Weele purchasing development model - ✔️✔️1. Transactional orientation, serve the
factors - supply relationship is reactive, relationship based on provision of raw materials
and components.
2. Commercial orientation, lowest unit price - relationship is based on price negotiation
aimed at achieving lowest prices for the organisation.
3. Co-ordinated purchasing - procurement and supply using uniform policies, processes
and systems. Often bureaucratic and slow to respond to units.
4. Internal integration cross-functional purchasing - relationship becomes more
integrated. Focuses on cross functional problem solving
5. External integration: supply chain-management - Outsourcing strategies developed
with supply chain partners.
6. Value chain orientation - Recognises P&S strategy needs to deliver value to the end
customer, strong relationships encouraged with suppliers.

EPC Contract - ✔️✔️An EPC Contract is appealing to the client as a turnkey solution and
a risk mitigation tool - the EPC contractor assumes all of the responsibilities and risk of
completing a programme

EPC Contract vs D&B - ✔️✔️Close links between EPC and D&B contracts - the
difference is that the EPC contract requires the contractor the design and construct a
building to a specification where it is capable of producing a certain level of output.

Mechanical completion - ✔️✔️Start up and commissioning of all systems in a building

Performance Testing - ✔️✔️Demonstrates that the building is suitable for the
requirements of a client

Performance Testing - ✔️✔️Is important in terms of the programme as it allow the
contractor to avoid LDs or claim bonuses if the programme is completed early

provisional acceptance - ✔️✔️the client accepts the performance on the basis that the
contractor remains responsible for finding a remedy

Commercial operation - ✔️✔️Upon acceptance, the responsibility and ownership
transfers to the client and the Commercial operation of the facility may commence

EPC contracts - ✔️✔️Are:

,- Fixed price contracts
- Have a fixed completion date
- Limited contractor claims as all risk is passed to the contractor
- Limits of liability - EPC contractors seek cap

EPC contracts - ✔️✔️The biggest risks that the client bares on an EPC contract is
ensuring that the spec is correct, and communicating what is required to teh contractor

Management Contractor Warranties - ✔️✔️Although clients only deal with one contractor
under mgmt. contracting, it may request warranties from the individual works
contractors so that direct claims can be made in the event that mgmt. contactor
becomes insolvent

Statement of need - ✔️✔️After a review of the statement of need, it may be decided that
a new progrmme is not needed

Workflow plan for: Management contracting and construction management - ✔️✔️-
Business Justification = Statement of need and prepare preliminary BC
- Feasibility Study = Allows the client to prepare a business case for the proposed
option
- Project Brief = the basis for the design
- Concept Design = the initial idea for the facility design is proposed
- Appointment of Management contractor or construction manager = tender, framework,
referral, interview
- Production information = the info needed for the works contractor to perform the
activities is prepared
- tender works contract = works or trade contracts released for tender
- Mobilisation = SOS after MC is appointed
- Construction = Contractor /CM assumes control of site
- Occupation and defects liability period = any defects which become apparent after
handover are rectified
- Post occupancy evaluation = review of how successful the programme was

- Business Justification - ✔️✔️Statement of need and prepare preliminary BC

- Feasibility Study - ✔️✔️Allows the client to prepare a business case for the proposed
option

Project Brief - ✔️✔️the basis for the design

Concept Design - ✔️✔️The initial idea for the facility design is proposed

Appointment of Management contractor or construction manager - ✔️✔️via tender,
framework, referral, interview

, Production information - ✔️✔️the info needed for the works contractor to perform the
activities is prepared

tender works contract - ✔️✔️works or trade contracts released for tender

Mobilisation - ✔️✔️SOS after MC is appointed

Construction - ✔️✔️Contractor /Construction Manager assumes control of site

Occupation and defects liability period - ✔️✔️any defects which become apparent after
handover are rectified

Post Occupancy Evaluation - ✔️✔️review of how successful the programme was

Construction Management - ✔️✔️Focuses on the administration and activities relating to
trade contracts that are placed with the client.

Construction Manager - ✔️✔️The CM is contracted by the client to oversee the
completion of a programme as an agent of the client

management contractor vs construction manager - ✔️✔️In essence, a management
contractor is a Prime contractor while a construction manager is an agent of the client

Design-Build-Operate and Ownership Contract - ✔️✔️In a DBO, the client still finances
and owns the asset at the the ened of the programme but reduces the nuber of external
parties that it has to deal with. The main aim is to improve the level of innovation, cost
efficency and performance delivery

Design-Build-Operate and Ownership Contract - ✔️✔️The distinguishing feature of a
DBO is that the contractor is responsible for both the design and build activities but also
it's operation and maintenance after completion.

Design-Build-Operate and Ownership Contract - ✔️✔️Is difficult to price as relies on
future unknowns and could result in a less cost-effective solution

Design-Build-Operate and Ownership Contract - ✔️✔️Typically used for medium-long
term projects with durations of 15-20 years

Design-Build-Operate and Ownership Contract - ✔️✔️The contractor is implicitly
encouraged to design and build a facility which is durable, reliable, and efficient to
operate
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
samuelmgichuki96

Get to know the seller

Seller avatar
samuelmgichuki96 Grand Canyon University
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
2 year
Number of followers
0
Documents
141
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions