ARE 5.0 PJM UPDATED ACTUAL Exam Questions and CORRECT Answers RFI - CORRECT ANSWER - RFI Type 1: Graphic/Confirming RFI RFI Type 2: Coordination/Missing Information RFI RFI Type 3: Code/Contract Information RFI RFIs are issued by contractors during the Construction Administration (CA), and Bidding & Negotiation phases of a project. During bidding and negotiations Architects respond to RFIs with Addenda and during the CA phase RFIs should be addressed through the AIA G716 and/or change orders/directives. In order to track the cost of quality on a project, RFIs should be tracked by the amount of hours that are required to respond to them

Show more Read less
Institution
ARE 5.0
Course
ARE 5.0










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ARE 5.0
Course
ARE 5.0

Document information

Uploaded on
January 30, 2025
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ARE 5.0 PJM UPDATED ACTUAL Exam
Questions and CORRECT Answers
RFI - CORRECT ANSWER - RFI Type 1: Graphic/Confirming RFI
RFI Type 2: Coordination/Missing Information RFI
RFI Type 3: Code/Contract Information RFI
RFIs are issued by contractors during the Construction Administration (CA), and Bidding &
Negotiation phases of a project.
During bidding and negotiations Architects respond to RFIs with Addenda and during the CA
phase RFIs should be addressed through the AIA G716 and/or change orders/directives.
In order to track the cost of quality on a project, RFIs should be tracked by the amount of hours
that are required to respond to them.


top down approach - CORRECT ANSWER - Top-down approach takes less time and
decisions can be taken faster


The top-down approach is more effective when the project cost is can only be roughly estimated


A combination of top down and bottom up approach would yield more accurate estimates


Personal injury protection - CORRECT ANSWER - protects against charges of defamation,
libel, and slander.


Test borings - CORRECT ANSWER - Test borings are performed by a geotechnical engineer
by drilling holes into the soil in order to determine some or all of the following:


Ability of the soil to support structures on the surface with or without additional assistance from
footings, piers, and other aids


Permeability of the soil to determine whether it will percolate sufficiently for an on-site septic
system

,Discover and monitor leakage from underground storage tanks or the presence of other
contaminants.


quality management actions during programming - CORRECT ANSWER - Teaming: Two or
more people should convene to gather information through client interviews, work sessions, and
direct observation; Benchmarking Tours: Benchmarking includes the direct observation of state-
of-the-art facilities similar to that being programmed; Consensus reviews: A second series of
interviews or work sessions is held to confirm that the knowledge was accurately communicated
to the design team; Phasing: Phasing includes setting priorities for detailed client information
and assembly of information.


The UniFormat framework establishes costs based on what - CORRECT ANSWER - The
UniFormat system breaks down projects by functional elements rather than material or method.
These functional elements are often defined by system or assembly. The UniFormat system is
useful for classifying and estimating construction during schematic design.


How does the completion of a schematic design help the preparation for the next project -
CORRECT ANSWER - It creates an ongoing critical discussion concerning its qualities and
familiarizes all team members with the products and process of the firm's creative approach.


an example of a special condition - CORRECT ANSWER - Union labor rates



What type of survey should the owner order - CORRECT ANSWER - ALTA
According to the AIA document B101 Section 5.4, the owner is to provide a survey that
describes physical characteristics, legal limitations, utility locations, and a written legal
description of the site. ALTA stands for American Land Title Association and an ALTA survey is
a comprehensive survey that reveals information specified by the American Land Title
Association, such as property boundaries, easements and encumbrances, encroachments, land
improvements, roads and property features, access and legal routes to the property, zoning
classification, flood zone classification, and legal property description.


According to the AIA suite of contract documents, days are defined as - CORRECT
ANSWER - Calendar days

, Privity - CORRECT ANSWER - two parties to a contract are not liable to a third party



Internal Failure Cost - CORRECT ANSWER - Internal failure costs are incurred to remedy
defects discovered before the product or service is delivered to the customer. These costs occur
when the results of work fail to reach design quality standards and are detected before they are
transferred to the customer. They could include:


Waste—performance of unnecessary work or holding of stock as a result of errors, poor
organization, or communication


Scrap—defective product or material that cannot be repaired, used, or sold


Rework or rectification—correction of defective material or errors


Failure analysis—activity required to establish the causes of internal product or service failure


Prevention Cost - CORRECT ANSWER - Prevention costs are incurred to prevent or avoid
quality problems. These costs are associated with the design, implementation, and maintenance
of the quality management system. They are planned and incurred before actual operation, and
they could include:


Product or service requirements—establishment of specifications for incoming materials,
processes, finished products, and services


Quality planning—creation of plans for quality, reliability, operations, production, and inspection


Quality assurance—creation and maintenance of the quality system


Training—development, preparation, and maintenance of programs

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1053
Member since
1 year
Number of followers
100
Documents
68976
Last sold
1 hour ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

166 reviews

5
72
4
30
3
42
2
8
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions