NFPA-99 Practice Test 2025 Questions and Answers
NFPA-99 Practice Test 2025 Questions and Answers Under which of these conditions shall the instrument Air Reserve header cylinders be permitted to be stored with the instrument air compressor? A) the mechanical equipment room does not contain a boiler. B) the medical air compressors are in the same room. C) the only motor-driven machinery in the room is for instrument air equipment. D) the room is secured with lockable doors. - CORRECT ANSWER - C) The only motor-driven machinery in the room is for the instrument air equipment Riser valves are those valves located where? A) adjacent to the main riser downstream of any zone valve. B) anywhere in the lateral branches of the piping system. C) in the mainline adjacent to the base of the riser. D) in the riser adjacent to the mainline. - CORRECT ANSWER - D) In the riser adjacent to the main line When is the initial pressure test conducted by the installer? A) after blowdown of the distribution piping. B) after installation of alarm sensors. C) before blowdown of distribution piping. D) before installation of station rough in assembly. - CORRECT ANSWER - A) After blow-down of the distribution piping. In those portions of systems intended to handle oxygen at pressure greater than 350 psi the inter connecting hose shall not contain what materials? A) brass. B) copper C) polymeric D) stainless steel - CORRECT ANSWER - C) Polymeric
Document information
- Uploaded on
- January 28, 2025
- Number of pages
- 21
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers