Propane Exam Questions with 100% Correct Answers
Latest Update 2025|| Graded A+ Guaranteed Pass
____________________________________________________________
Fined an unlimited amount per violation
Any person violating Alabama LP gas laws or rules and regulations promulgated by the board
may be:
10
A steel or aluminum cylinder that passes a visual inspection may be filled if the time elapsed
since the date of manufacture is less than ——— years
Holders of USDOT "RIN" number, appropriate Alabama LP Gas Board permit holders, and
qualified individuals
Who can requalify LPG DOT cylinders in AL?
Visual inspection of cylinder
Making sure the collar and foot ring are present and serviceable, making sure the cylinder is not
out of date, and making sure the cylinder does not have excessive corrosion, dents, cuts, or
gouges.
Alabama LP Gas Board
Incidents involving LP gas such as vehicle accidents, fires, explosions, carbon monoxide events,
complaints of defective installations, and other similar incidents must be reported to whom in
addition to emergency first response personnel?
Performing any unsupervised work tasks
New employees of permit holders shall be required to pass an exam administered by the
Alabama LP Gas board before:
, Must be weighed to ensure that overfilling does not occur in case the OPD valance fails
In Alabama, cylinders that have an OPD valve:
The red tag is removed by or authorized to be removed by a board employee or appointee
A system that has been red tagged by the al LP gas board shall not be placed back into service
until it is roughly into compliance with adopted safety codes and:
Remove the sleeve to clearly expose all portions of the cylinder for visual inspection
Prior to filling a cylinder wrapped with a "sleeve":
Their relief valves replaced.
Steel or aluminum forklift cylinders due their first requalification must also have:
There is reasonable cause to suspect danger exists to the public
The administrator and inspectors of the Alabama LP gas board may enter any building or upon
any premises connected to an LP gas system dot the sole purpose of conducting an inspection
or investigation of such system if:
01/13E
Cylinders that have been properly requalified must be marked with appropriate requalification
info. Which of the following is an example of proper visual requalification marking?
A. 01/13E
B. 01/13V
C. V123456 0113 E
D. 01/13
100.38
A cylinder marked with a water capacity of 239 lbs. will hold how much propane?
Vapor propane
Purging of new propane cylinders prior to their first filling must be performed with:
Latest Update 2025|| Graded A+ Guaranteed Pass
____________________________________________________________
Fined an unlimited amount per violation
Any person violating Alabama LP gas laws or rules and regulations promulgated by the board
may be:
10
A steel or aluminum cylinder that passes a visual inspection may be filled if the time elapsed
since the date of manufacture is less than ——— years
Holders of USDOT "RIN" number, appropriate Alabama LP Gas Board permit holders, and
qualified individuals
Who can requalify LPG DOT cylinders in AL?
Visual inspection of cylinder
Making sure the collar and foot ring are present and serviceable, making sure the cylinder is not
out of date, and making sure the cylinder does not have excessive corrosion, dents, cuts, or
gouges.
Alabama LP Gas Board
Incidents involving LP gas such as vehicle accidents, fires, explosions, carbon monoxide events,
complaints of defective installations, and other similar incidents must be reported to whom in
addition to emergency first response personnel?
Performing any unsupervised work tasks
New employees of permit holders shall be required to pass an exam administered by the
Alabama LP Gas board before:
, Must be weighed to ensure that overfilling does not occur in case the OPD valance fails
In Alabama, cylinders that have an OPD valve:
The red tag is removed by or authorized to be removed by a board employee or appointee
A system that has been red tagged by the al LP gas board shall not be placed back into service
until it is roughly into compliance with adopted safety codes and:
Remove the sleeve to clearly expose all portions of the cylinder for visual inspection
Prior to filling a cylinder wrapped with a "sleeve":
Their relief valves replaced.
Steel or aluminum forklift cylinders due their first requalification must also have:
There is reasonable cause to suspect danger exists to the public
The administrator and inspectors of the Alabama LP gas board may enter any building or upon
any premises connected to an LP gas system dot the sole purpose of conducting an inspection
or investigation of such system if:
01/13E
Cylinders that have been properly requalified must be marked with appropriate requalification
info. Which of the following is an example of proper visual requalification marking?
A. 01/13E
B. 01/13V
C. V123456 0113 E
D. 01/13
100.38
A cylinder marked with a water capacity of 239 lbs. will hold how much propane?
Vapor propane
Purging of new propane cylinders prior to their first filling must be performed with: