Who is responsible for establishing the Site Safety Program and culture? - ✔✔The
construction manager
When should an STA be done? - ✔✔Each and every time a task is being performed or
when the task changes.
Who is responsible for setting the project objectives , budget, and selecting the other
project participants? - ✔✔The owner
A professional registered by the state - ✔✔Engineer
looked to and for the smooth orchestration of the project - ✔✔Construction
Manager
Responsible for financing and land acquisition - ✔✔Owner
Wants clear on time directions with no change - ✔✔Trade Contractor
Who defines the project schedule and budget, while determining the delivery method
and selection the other project participants? - ✔✔Owner
Who interpreters the plans and specification, this person may assist in problem solving,
approve and reject material, and generally solve technical site issues. - ✔✔Field
engineer
, Who configures the project team, schedules the job, and sets up the cost control
system. This person must have a solid understanding of project administration, good
verbal and written communication skills, knowledge of labor union issues, and technical
construction knowledge. - ✔✔Construction Manager
Describe the difference between a public owner and a private owner. - ✔✔Private
owner are government bodies that use public funds to build projects. Private owner are
typically companies or private individuals with more flexibility nohow their projects are
organized and managed.
Public owners must follow specific guidelines.
A structural steel column collapses and is found to be undersized. Which project
participant is most likely to be liable for this mistake. - ✔✔Engineer
Define sustainable construction. - ✔✔Creating and operating a healthy built
environment based on resource efficient and ecological design.
Define Sustainable development. - ✔✔Is the development that meets the needs of
the present without compromising the ability of the future generations to meet their
own needs.
Name the 7 principles of sustainable construction. - ✔✔1. Reduce
2. Reuse
3. Recycle
4. Nature
5. Toxics
100% Correct Answers | Already Graded A+
Who is responsible for establishing the Site Safety Program and culture? - ✔✔The
construction manager
When should an STA be done? - ✔✔Each and every time a task is being performed or
when the task changes.
Who is responsible for setting the project objectives , budget, and selecting the other
project participants? - ✔✔The owner
A professional registered by the state - ✔✔Engineer
looked to and for the smooth orchestration of the project - ✔✔Construction
Manager
Responsible for financing and land acquisition - ✔✔Owner
Wants clear on time directions with no change - ✔✔Trade Contractor
Who defines the project schedule and budget, while determining the delivery method
and selection the other project participants? - ✔✔Owner
Who interpreters the plans and specification, this person may assist in problem solving,
approve and reject material, and generally solve technical site issues. - ✔✔Field
engineer
, Who configures the project team, schedules the job, and sets up the cost control
system. This person must have a solid understanding of project administration, good
verbal and written communication skills, knowledge of labor union issues, and technical
construction knowledge. - ✔✔Construction Manager
Describe the difference between a public owner and a private owner. - ✔✔Private
owner are government bodies that use public funds to build projects. Private owner are
typically companies or private individuals with more flexibility nohow their projects are
organized and managed.
Public owners must follow specific guidelines.
A structural steel column collapses and is found to be undersized. Which project
participant is most likely to be liable for this mistake. - ✔✔Engineer
Define sustainable construction. - ✔✔Creating and operating a healthy built
environment based on resource efficient and ecological design.
Define Sustainable development. - ✔✔Is the development that meets the needs of
the present without compromising the ability of the future generations to meet their
own needs.
Name the 7 principles of sustainable construction. - ✔✔1. Reduce
2. Reuse
3. Recycle
4. Nature
5. Toxics