Construction Management Actual exam
Questions and 100% Correct Answers Graded A+
What is lean construction, and from what industry does its concepts steam? - ✔✔Is a
philosophy that focuses on adding value with less work and the elimination of waste in
the building process. It stems from the manufacturing industry, particularly the Toyota
Production System.
What are the 4 primary project values to be managed, monitored, and controlled? -
✔✔Time
Cost
Quality
Safety
Why is scope definition so important to the construction process? - ✔✔It Describes
the extent of the work that is to be performed by the contractor.
Project Delivery? - ✔✔The overall structural or organizational framework used to pull
all the aspects of designing and building a construction project together.
Construction Management as a function and as a project delivery method? -
✔✔Functions- Task by the contractor such as estimating, scheduling, cost control,
and contract administration in order to monitor, manage contract.
Method- Arrangement whereby the construction manager is hired by the owner to
provide services. Under CM project delivery the construction manager may or may not
be facilitated to carry out the construction work itself.
,Three Primary Delivery Methods and how do they differ? - ✔✔*Design Bid Build-
owner has spate contracts with the designer and the contractor
* Design Build- there is only one contract between the owner and the design-build
entity for both the design and construction
* Construction Management- owner hold three contracts: one with the construction
manager, one with the designer, and one with the contractor
Explain how agency Cm is different from at-risk CM? - ✔✔Agency Cm- construction
manager has no liability for the construction and acts only as an agent or advisor to the
owner
At- risk Cm- construction manager acts as an advisor to the owner during the design
phase and is liable for the construction
What is mean by the term fast tracking? - ✔✔A technique used to speed up the
completion of a construction project by overlapping the design and construction process
Three basic ways in which design-build entity may be configure? - ✔✔- have the
contractor and the designer create and informal partnership for a project
- have a full-service design-build firm in which the designers and the contractors work
for the same company
- establish a legal join in venture between designer and contractor for a single project
8 functions of construction management? - ✔✔- estimation project - contract
administration
- managing job site - construction operations
- planning/scheduling project - controlling project performance - managing project
quality - managing project safety - managing project risk
, Why is open bidding required in public projects? - ✔✔because taxpayer dollars are at
stake, and an open bid allows any contractor to submit, reducing the risk fraud,
favoritism
Tool used to reduce the number of bidders on a public project and increase the quality
of the contractor pool? - ✔✔The requirement for a prequalification statement
What is the purpose of a labor and materials payment bond? - ✔✔a guarantee,
backed by a surety, that payment for the contractor's labor and materials used on the
project will be made
Name three selection methods used to buy construction services, and identify the
solicitation instructment used for each one? - ✔✔*low bid selection- invitation for
bids (advertisement)
* best value selection- request for proposals
* qualification based- request for qualification
Most common procurement method? Criteria to select winner? - ✔✔* Design- bid-
build.......low price
What is the name of the official document that the owners uses to notify the contractor
to start construction? - ✔✔Notice to proceed
Two primary selection criteria categories considered when using best-value method? -
✔✔* price (quantitative factors)
*qualification factors- design, management, past performance
What two major components make up the contract documents? - ✔✔* drawing
Questions and 100% Correct Answers Graded A+
What is lean construction, and from what industry does its concepts steam? - ✔✔Is a
philosophy that focuses on adding value with less work and the elimination of waste in
the building process. It stems from the manufacturing industry, particularly the Toyota
Production System.
What are the 4 primary project values to be managed, monitored, and controlled? -
✔✔Time
Cost
Quality
Safety
Why is scope definition so important to the construction process? - ✔✔It Describes
the extent of the work that is to be performed by the contractor.
Project Delivery? - ✔✔The overall structural or organizational framework used to pull
all the aspects of designing and building a construction project together.
Construction Management as a function and as a project delivery method? -
✔✔Functions- Task by the contractor such as estimating, scheduling, cost control,
and contract administration in order to monitor, manage contract.
Method- Arrangement whereby the construction manager is hired by the owner to
provide services. Under CM project delivery the construction manager may or may not
be facilitated to carry out the construction work itself.
,Three Primary Delivery Methods and how do they differ? - ✔✔*Design Bid Build-
owner has spate contracts with the designer and the contractor
* Design Build- there is only one contract between the owner and the design-build
entity for both the design and construction
* Construction Management- owner hold three contracts: one with the construction
manager, one with the designer, and one with the contractor
Explain how agency Cm is different from at-risk CM? - ✔✔Agency Cm- construction
manager has no liability for the construction and acts only as an agent or advisor to the
owner
At- risk Cm- construction manager acts as an advisor to the owner during the design
phase and is liable for the construction
What is mean by the term fast tracking? - ✔✔A technique used to speed up the
completion of a construction project by overlapping the design and construction process
Three basic ways in which design-build entity may be configure? - ✔✔- have the
contractor and the designer create and informal partnership for a project
- have a full-service design-build firm in which the designers and the contractors work
for the same company
- establish a legal join in venture between designer and contractor for a single project
8 functions of construction management? - ✔✔- estimation project - contract
administration
- managing job site - construction operations
- planning/scheduling project - controlling project performance - managing project
quality - managing project safety - managing project risk
, Why is open bidding required in public projects? - ✔✔because taxpayer dollars are at
stake, and an open bid allows any contractor to submit, reducing the risk fraud,
favoritism
Tool used to reduce the number of bidders on a public project and increase the quality
of the contractor pool? - ✔✔The requirement for a prequalification statement
What is the purpose of a labor and materials payment bond? - ✔✔a guarantee,
backed by a surety, that payment for the contractor's labor and materials used on the
project will be made
Name three selection methods used to buy construction services, and identify the
solicitation instructment used for each one? - ✔✔*low bid selection- invitation for
bids (advertisement)
* best value selection- request for proposals
* qualification based- request for qualification
Most common procurement method? Criteria to select winner? - ✔✔* Design- bid-
build.......low price
What is the name of the official document that the owners uses to notify the contractor
to start construction? - ✔✔Notice to proceed
Two primary selection criteria categories considered when using best-value method? -
✔✔* price (quantitative factors)
*qualification factors- design, management, past performance
What two major components make up the contract documents? - ✔✔* drawing