ICC Bolting | Q&A Latest 2024/2025 | 100% PASS
ICC Bolting | Q&A Latest 2024/2025 | 100% PASS According to the IBC, the "blank" is to hire the special inspector. - Answer -owner or owners agent. 2009 IBC Section 1704.1 According to the IBC, the "blank" is the responsible for the approval of a person's qualifications to act as a special inspector. - Answer -code official. 2009 IBC, Section 1704.1 According to the IBC, discrepancy corrections are made known to the building official by: - Answer -final report. 2009 IBC, Section1704.1.2 When is the code official to be made aware of a discrepancy found during a special inspection? - Answer -If it is not corrected by the contractor. 2009 IBC, Section 1704.1.2 According to the Model Program for Special Inspection, the special inspector is to document work that is nonconforming: - Answer -In a written report - Section II B 4 - Model Programs According to the Model Program for Special Inspection, the special inspector is to prepare written report of inspection: - Answer -After each inspection visit - Section II B 5 - Model Progr
Document information
- Uploaded on
- January 23, 2025
- Number of pages
- 21
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers