Georgia Pest Control Registration Exam–
Questions and Correct answers
OSHA - ✔✔Occupational Safety and Health Administration 1970
Any company with 10 or more employees to keep certain records and make reports
including all work related deaths, injuries, and illnesses.
SPCA - ✔✔Structural Pest Control Act
Primary law for the pest management industry in Georgia.
The Department of Agriculture is the enforcement agency for the SPCA.
Requirements for Georgia SPCA - ✔✔Company License
-All pest management companies must be licensed before they begin operation
Certified Operator
-Every pest management company (branch) must employee at least one person who has
taken and passed the certification exam.
Registered Employees
-all non-certified technicians must be registered, in order to work without the presence
of a certified or registered employee.
Re-certification/re-registration
-All certified and registered employees must be re-certified and re-registered
periodically.
Re-certification
-5 years
,-HPC- 25 hours
-WDO- 25 hours
-FUM- 12 hours
Re-registration
-2 years
-HPC- 8 hours
-WDO- 8 hours
-FUM- 3 hours
Designated Certified Operators (DCO) Categories - ✔✔WDO- Wood Destroying
Organisms
HPC- Household Pest Control
FUM- Fumigation
Contracts for Control of WDO - ✔✔A contract must be issued for every WDO service
before the work begins.
Copied must be kept for 2 years following the expiration of the contract.
Comprehensive Post Construction Soil Termiticide Application for Subterranean
Termites - ✔✔Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide to all exterior and interior soils
Defined Post Construction Soil Termiticide Application for Subterranean Termites -
✔✔Removal of all cellulosic material from under the building
,Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all accessible termite tunnels
Application of of an approved termiticide
Post Construction Soil Termiticide Application for Subterranean Termites, Other than
Baits - ✔✔Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide
Post Construction Termiticide Bait Application for Subterranean Termites -
✔✔Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Install/service an approved baiting system
Pre-Construction Termiticide Bait Application for Subterranean Termites -
✔✔Systems must be monitored for one year at no additional cost when installed for
pre-construction or to control infestations found during the coverage period of an
official Georgia Wood Infestation Inspection Report.
Alternate Application Techniques (AAT) - ✔✔AATs must be approved by the
commission prior to use
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
, Removal of all visible and accessible termite tunnels
Application of an approved soil termiticide, where application includes all areas
specified in defined, comprehensive, or pre-construction treatments
Treatment of Powder Post Beetles and Wood Borers - ✔✔Application of an approved
pesticide
Ventilation of the under-floor space between the bottom of the floor joists and the
earth to meet the requirements of the International Residential Building Code for one
and two family dwellings
Treatment of Wood Decay Fungi - ✔✔Ventilation of the under-floor space between
the bottom of the floor joists and the earth to meet the requirements of the
International Residential Building Code for one and two family dwellings
Installation of a vapor barrier to cover a minimum of 70% of the exposed soil surface in
a crawl space
Treatment of Dry Wood Termites - ✔✔Application of an approved pesticide
Treatment of Schools - ✔✔Treatment of Schools involves taking special precautions
to minimize the potential exposure of students to pesticides.
-Application of pesticides in rooms vacant for 3+ hours
-Applications of bait formulations, rodenticide baits in tamper-resistant containers,
insecticides when students not in the room.
-Outdoor: allowed if students are not expected to be present within 20 feet of the
application site. Must be clearly marked by fence or similar barrier.
-All dilutions must be mixed outside of student occupied areas.
-Liquid termiticides must be performed when students are not present (20+ feet away)
and are not expected to be present for 3+ hours
Questions and Correct answers
OSHA - ✔✔Occupational Safety and Health Administration 1970
Any company with 10 or more employees to keep certain records and make reports
including all work related deaths, injuries, and illnesses.
SPCA - ✔✔Structural Pest Control Act
Primary law for the pest management industry in Georgia.
The Department of Agriculture is the enforcement agency for the SPCA.
Requirements for Georgia SPCA - ✔✔Company License
-All pest management companies must be licensed before they begin operation
Certified Operator
-Every pest management company (branch) must employee at least one person who has
taken and passed the certification exam.
Registered Employees
-all non-certified technicians must be registered, in order to work without the presence
of a certified or registered employee.
Re-certification/re-registration
-All certified and registered employees must be re-certified and re-registered
periodically.
Re-certification
-5 years
,-HPC- 25 hours
-WDO- 25 hours
-FUM- 12 hours
Re-registration
-2 years
-HPC- 8 hours
-WDO- 8 hours
-FUM- 3 hours
Designated Certified Operators (DCO) Categories - ✔✔WDO- Wood Destroying
Organisms
HPC- Household Pest Control
FUM- Fumigation
Contracts for Control of WDO - ✔✔A contract must be issued for every WDO service
before the work begins.
Copied must be kept for 2 years following the expiration of the contract.
Comprehensive Post Construction Soil Termiticide Application for Subterranean
Termites - ✔✔Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide to all exterior and interior soils
Defined Post Construction Soil Termiticide Application for Subterranean Termites -
✔✔Removal of all cellulosic material from under the building
,Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all accessible termite tunnels
Application of of an approved termiticide
Post Construction Soil Termiticide Application for Subterranean Termites, Other than
Baits - ✔✔Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide
Post Construction Termiticide Bait Application for Subterranean Termites -
✔✔Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Install/service an approved baiting system
Pre-Construction Termiticide Bait Application for Subterranean Termites -
✔✔Systems must be monitored for one year at no additional cost when installed for
pre-construction or to control infestations found during the coverage period of an
official Georgia Wood Infestation Inspection Report.
Alternate Application Techniques (AAT) - ✔✔AATs must be approved by the
commission prior to use
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
, Removal of all visible and accessible termite tunnels
Application of an approved soil termiticide, where application includes all areas
specified in defined, comprehensive, or pre-construction treatments
Treatment of Powder Post Beetles and Wood Borers - ✔✔Application of an approved
pesticide
Ventilation of the under-floor space between the bottom of the floor joists and the
earth to meet the requirements of the International Residential Building Code for one
and two family dwellings
Treatment of Wood Decay Fungi - ✔✔Ventilation of the under-floor space between
the bottom of the floor joists and the earth to meet the requirements of the
International Residential Building Code for one and two family dwellings
Installation of a vapor barrier to cover a minimum of 70% of the exposed soil surface in
a crawl space
Treatment of Dry Wood Termites - ✔✔Application of an approved pesticide
Treatment of Schools - ✔✔Treatment of Schools involves taking special precautions
to minimize the potential exposure of students to pesticides.
-Application of pesticides in rooms vacant for 3+ hours
-Applications of bait formulations, rodenticide baits in tamper-resistant containers,
insecticides when students not in the room.
-Outdoor: allowed if students are not expected to be present within 20 feet of the
application site. Must be clearly marked by fence or similar barrier.
-All dilutions must be mixed outside of student occupied areas.
-Liquid termiticides must be performed when students are not present (20+ feet away)
and are not expected to be present for 3+ hours