Power Engineering 4B Exam Question Bank, Complete With 2000 Questions And Correct Answers, Latest d - correct answerThe most important rule in safe operation of a steam boiler is to a) keep the heat transfer surfaces clean b) maintain the boiler room log c) try to keep make up water to a minimum d) keep water in the boiler at the proper level c - correct answerin a multiple boiler high pressure steam plant , when starting an entire system from cold a) all boilers are started and warmed at the same time b) boilers remaining off-line must have their boiler and header stop valves open, and their non-return drain valves shut c) the entire system warms and pressurizes as one boiler warms, except for the boilers remaining off-line d) a small auxiliary heating boiler is used to warm the steam lines while the power boilers are warming d - correct answerdeaerators often have low level alarms and low-low level trips a) in case of boiler trips b) in case the boiler feed water valve fails open c) in case the boiler feed water pumps trip d) in case the condensate transfer pumps trip c - correct answerboilers should be warmed up a) with maximum combustion air , to prevent smoking b) rapidly, so the metal heats up faster c) slowly, to minimize differential expansion and thermal shock d) using only the pilot burner c - correct answerBefore performing a try lever test on a power boiler, what pressure should the boiler be at a) the boiler MAWP b) the set pressure of the safety valve c) at least 75% of the set pressure of the safety valve d)at or above 750kPa

Content preview

Power Engineering 4B Exam Question Bank,
Complete With 2000 Questions And Correct
Answers, Latest
d - correct answer>>>The most important rule in safe operation of a steam boiler is to



a) keep the heat transfer surfaces clean

b) maintain the boiler room log

c) try to keep make up water to a minimum

d) keep water in the boiler at the proper level



c - correct answer>>>in a multiple boiler high pressure steam plant , when starting an entire system from
cold



a) all boilers are started and warmed at the same time

b) boilers remaining off-line must have their boiler and header stop valves open, and their non-return
drain valves shut

c) the entire system warms and pressurizes as one boiler warms, except for the boilers remaining off-line

d) a small auxiliary heating boiler is used to warm the steam lines while the power boilers are warming



d - correct answer>>>deaerators often have low level alarms and low-low level trips



a) in case of boiler trips

b) in case the boiler feed water valve fails open

c) in case the boiler feed water pumps trip

d) in case the condensate transfer pumps trip



c - correct answer>>>boilers should be warmed up



a) with maximum combustion air , to prevent smoking

b) rapidly, so the metal heats up faster

,c) slowly, to minimize differential expansion and thermal shock

d) using only the pilot burner



c - correct answer>>>Before performing a try lever test on a power boiler, what pressure should the
boiler be at



a) the boiler MAWP

b) the set pressure of the safety valve

c) at least 75% of the set pressure of the safety valve

d)at or above 750kPa



c - correct answer>>>when closing up a boiler



a) handhole and manhole gaskets must be coated with a sealant, such as graphite paste or silicone

b) handhole and manhole gaskets should be reused , because they are expensive

c) new handhole and manhole gaskets must be used, to prevent major blowouts and costly unplanned
boiler outages

d) handhole and manhole yolks must be torqued until the gaskets are compressed to less than 1mm
thick



d - correct answer>>>On a semi-automatic ignition system, the switch on the supervised cock



a) shuts down the boiler if the main test firing valve is opened during operation

b) allows the boiler to automatically recycle

c) keeps the boiler from pre-purging if the test firing valve is open

d) keeps the boiler from pre-purging if the main test firing valve is open



d - correct answer>>>Failure to _______________ the furnace thoroughly before light-up can cause
furnace explosion

, a) preheat

b) soot-blow

c) cool

d) purge



d - correct answer>>>What is the recommended boiler water pH for wet layup?



a) 7

b) 7.5

c) 12

d) 10



d - correct answer>>>one cause of main flame failure in oil fired boilers is



a) excessive fuel temperature

b) Excessive purge duration

c) excessive furnace temperature

d) water in fuel



d - correct answer>>>Which of the following is NOT an important reason to take plant readings



a) to diagnose problems with equipment or processes

b) to compare current field conditions with the expected performance of the equipment

c) to identify operating trends

d) to keep operators from becoming complacent



a - correct answer>>>If the safety relief valve of a hot water heating boiler is set to open at 207kPa, the
operating pressures should not exceed

Document information

Uploaded on
January 22, 2025
Number of pages
29
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
64
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions