U3 ICC Tank Tightness Testing exam test questions with correct answers verified A+ guide Tips #NEW!!!
U3 ICC Tank Tightness Testing exam test questions with correct answers verified A+ guide Tips #NEW!!!1. On a steel tank without cathodic protection, if a coat- ing is flawed, what happens at the flaw? a. Cathodic surface is increased b. Current flow is increased from this area c. Current flow is increased to this area b. Current flow is increased from this area 2. On an impressed current cathodic protection system, b. Cathode the negative wire of the rectifier is connected to the: a. Anode b. Cathode c. Drop tube d. Dielectric union 3. All are examples of acceptable release detection for tanks, except: a. Impressed current cathodic protection b. Automatic tank gauging c. Statistical inventory reconciliation d. Soil-vapor monitoring 4. When a tank is temporarily closed, the cathodic pro- tection system: a. Must be turned off b. Must remain in operation c. Should be removed d. Operator can have it on or off. 5. When a steel tank is installed with a galvanic CP sys- tem attached, the tank gauges are usually connected through a riser with a dielectric bushing. What is the purpose of that? a. To prevent static discharge b. To minimize effects of noise c. To electrically isolate the tank from the tank gauge d. To prevent water intrusion in the tank 6. Factory-installed diectric coatings may include all of the following except: a . Asphalt a. Impressed cur- rent cathodic pro- tection b. Must remain in operation c. To electrically isolate the tank from the tank gauge a . Asphalt b. epoxies c. Enamels d. fiberglass-reinforced plastic 7. According to the EPA, Tank tightness test data must be maintained for: a. 18 months b. 3 years c. 5 years d. Until the next test is performed 8. How long must records of UST system repairs be available on site? a. 60 days b.1 year c. 5 years d. for the remaining lifetime of the UST system 9. In the event of a release, what is the reporting require- ment? a. ICC licensed supervisor must report the leak within 24 hours b. Owner/Operator must report the leak within 24 hours c. Owner/Operator must report the leak within 18 hours d. ICC licensed supervisor must report the leak within 18 hours 10. At what size spill does it need to be reported? a. 5 gallons b. 10 gallons c. 15 gallons d. 25 gallons 11. Contamination of soils is encountered before remov- ing a tank. The clean up must be initiated by the: a. Fire Marshal b. Ecology inspector d. Until the next test is performed d. for the remain- ing lifetime of the UST system b. Owner/Opera- tor must report the leak within 24 hours d. 25 gallons c. Owner / opera- tor of the UST sys- tem c. Owner / operator of the UST system d. Landlord 12. All are examples of overfill protection, except: a. Vent restricting device b. Drop tube with an automatic shut off device c. Audible and visual alarm d. Expandable bladder in manway 13. Defin
Document information
- Uploaded on
- January 18, 2025
- Number of pages
- 15
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers