Phase 1 equipment is related to all of the following except: - Answer-Dispenser mounted vapor
recovery equipment
According to EO VR-201/202-N, the only authorized hose configuration is: - Answer-Any Hose
Configuration
The most current ARB approved Phase II vapory recovery is: - Answer-EVR
When a certified Healy Technician is replacing the VP 1000 during operational hours, they should do all
of the following to eliminate the potentials problem except: - Answer-review service with gas station
operator
The following component is not part of the Healy Phase II vapory recovery system: - Answer-Healy
Model 900 Vapor Motor
The max dispensing flow rate of a Healy 900 Series EVR nozzel is: - Answer-10 GPM
According to VR-201/202-N, a _____ should be installed on the Healy system if the flow rate is above 10
GPM - Answer-Flow limiter
, The Quarterly Inspection and Testing of a Healy Phase II EVR system should include the following except:
- Answer-conduct a pressure decay test by a Healy Certified Technician
The first sign of oxygen depletion is: - Answer-accelerated breathing and heartbeat
According to PEI 500, each of the following are proper methods of removing a portion of a GDF from
service except: - Answer-noting event in the defective equipment log
What procedure checks the integrity of the vapor check valve in the nozzle? - Answer-Nozzle bag test
Which of the following conditions is a Healy certified technician not required to repair? - Answer-
Reconnection of a breakaway after a drive off
What procedure is required after a nozzle spout change? - Answer-Nozzle automatic shutoff test
A vapor recovery system generally uses what unit of measurment? - Answer-Inches of water column
During the annual inspection and testing of the vapor recovery system; the first three steps are to:
a) Conduct static pressure performance of the Healy Clean Air Separator
b) Conduct pressure decay test
c) Conduct dispenser vapor line tightness test
What is the 4th step? - Answer-Conduct V/L test on all nozzles
What is the lower limit of acceptable V/L for a nozzle? - Answer-.95
In order for a technician to be authorized to clear an ISD Alarm, he or she must be certified by which of
the following? - Answer-Manufacture
Phase 1 equipment is related to all of the following except: - Answer-Dispenser mounted vapor
recovery equipment
According to EO VR-201/202-N, the only authorized hose configuration is: - Answer-Any Hose
Configuration
The most current ARB approved Phase II vapory recovery is: - Answer-EVR
When a certified Healy Technician is replacing the VP 1000 during operational hours, they should do all
of the following to eliminate the potentials problem except: - Answer-review service with gas station
operator
The following component is not part of the Healy Phase II vapory recovery system: - Answer-Healy
Model 900 Vapor Motor
The max dispensing flow rate of a Healy 900 Series EVR nozzel is: - Answer-10 GPM
According to VR-201/202-N, a _____ should be installed on the Healy system if the flow rate is above 10
GPM - Answer-Flow limiter
, The Quarterly Inspection and Testing of a Healy Phase II EVR system should include the following except:
- Answer-conduct a pressure decay test by a Healy Certified Technician
The first sign of oxygen depletion is: - Answer-accelerated breathing and heartbeat
According to PEI 500, each of the following are proper methods of removing a portion of a GDF from
service except: - Answer-noting event in the defective equipment log
What procedure checks the integrity of the vapor check valve in the nozzle? - Answer-Nozzle bag test
Which of the following conditions is a Healy certified technician not required to repair? - Answer-
Reconnection of a breakaway after a drive off
What procedure is required after a nozzle spout change? - Answer-Nozzle automatic shutoff test
A vapor recovery system generally uses what unit of measurment? - Answer-Inches of water column
During the annual inspection and testing of the vapor recovery system; the first three steps are to:
a) Conduct static pressure performance of the Healy Clean Air Separator
b) Conduct pressure decay test
c) Conduct dispenser vapor line tightness test
What is the 4th step? - Answer-Conduct V/L test on all nozzles
What is the lower limit of acceptable V/L for a nozzle? - Answer-.95
In order for a technician to be authorized to clear an ISD Alarm, he or she must be certified by which of
the following? - Answer-Manufacture