Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

C393 IT Foundations Question And Correct Solutions

Document preview thumbnail
Preview 3 out of 24 pages

C393 IT Foundations Question And Correct Solutions frontside bus - Answer -Signal pathway for communication between CPU and memory backside bus - Answer -Signal pathway between CPU and L2 or L3 cache frontside bus - Answer -Where cache is placed if no backside bus exists ATX - Answer -Largest motherboard form factor, puts the processor and memory in line with the fan output of the power supply, allowing the processor to run cooler micro ATX - Answer -Follows the ATX principle of component placement for enhanced cooling but with a smaller footprint, fits into ATX cases ITX - Answer -Family of small motherboard form factors with mini-, nano-, pico-, and mobile- categories. Southbridge - Answer -This is in charge of anything other than CPU, memory and cache, and PCIe SODIMM and MicroDIMM - Answer -Form factors for laptop memory L1 cache - Answer -Term for cache memory built into the processor L2 cache - Answer -Term for cache memory external to the processor, possibly physically close by L3 cache - Answer -Term for cache memory on the motherboard, when the processor already has external cache firmware - Answer -The name given to any software that is encoded in hardware, usually on ROM, and run without extra instructions from the operating system option ROMs - Answer -Another term for things like the SCSI BIOS and video BIOS Parity checking - Answer -A rudimentary memory error-checking scheme that offers no error correction 1 - Answer -How many bits can ECC memory correct? single-sided memory - Answer -Memory modules with chips on just one side double-sided memory - Answer -Memory modules with chips on both sides, which the memory controller must switch between buffered or registered memory modules - Answer -These memory modules include specialized chips that act as buffers for all signals from the memory controller, except, in some cases, the data signals Load-reduced DIMMs - Answer -A form of registered DIMMs that increase performance by maintaining parallel communication onboard - Answer -Term for connectors included on the motherboard off board - Answer -Term for connectors not on the motherboard, but residing on adapter cards

Content preview

Georgia Pest Control Registration Exam
And Correct Answer
GSPCC - Answer -✔✔Georgia Structural Pest Control Commission

GDA - Answer -✔✔Georgia Department of Agriculture

FIFRA - Answer -✔✔Federal Insecticide, Fungicide, and Rodenticide Act 1947
Regulate the registration and labeling of pesticides.
Amended in 1972 to include classification systems for types of pesticides and created
requirements for:
-Certification of applicators authorized to apply pesticides
-Safety of workers using pesticides
-Protection of environment from contamination by pesticides
-Creation of EPA to administer FIFRA

EPA - Answer -✔✔Environmental Protection Agency

Endangered Species Act of 1973 - Answer -✔✔Required EPA to ensure that using
registered pesticides would not harm species placed on endangered species list.

FQPA - Answer -✔✔Food Quality Protection Act of 1996
Amended FIFRA and directed EPA to regulate pesticides through establishment of
tolerance levels for pesticides from dietary, drinking water, and non-occupational
(residential) exposure in conjunction with the Federal, Food, Drug, and Cosmetic Act.

In order to obtain a registration, EPA and GDA require pesticide manufactures provide
what information to the EPA? - Answer -✔✔-Toxicity of the pesticide
-Hazard to the applicator
-Effect on the environment

OSHA - Answer -✔✔Occupational Safety and Health Administration 1970
Any company with 10 or more employees to keep certain records and make reports
including all work related deaths, injuries, and illnesses.

SPCA - Answer -✔✔Structural Pest Control Act
Primary law for the pest management industry in Georgia.
The Department of Agriculture is the enforcement agency for the SPCA.

Requirements for Georgia SPCA - Answer -✔✔Company License
-All pest management companies must be licensed before they begin operation

Certified Operator

,-Every pest management company (branch) must employee at least one person who
has taken and passed the certification exam.

Registered Employees
-all non-certified technicians must be registered, in order to work without the presence
of a certified or registered employee.

Re-certification/re-registration
-All certified and registered employees must be re-certified and re-registered
periodically.
Re-certification
-5 years
-HPC- 25 hours
-WDO- 25 hours
-FUM- 12 hours
Re-registration
-2 years
-HPC- 8 hours
-WDO- 8 hours
-FUM- 3 hours

Designated Certified Operators (DCO) Categories - Answer -✔✔WDO- Wood
Destroying Organisms
HPC- Household Pest Control
FUM- Fumigation

Contracts for Control of WDO - Answer -✔✔A contract must be issued for every WDO
service before the work begins.
Copied must be kept for 2 years following the expiration of the contract.

Comprehensive Post Construction Soil Termiticide Application for Subterranean
Termites - Answer -✔✔Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide to all exterior and interior soils

Defined Post Construction Soil Termiticide Application for Subterranean Termites -
Answer -✔✔Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all accessible termite tunnels
Application of of an approved termiticide

Post Construction Soil Termiticide Application for Subterranean Termites, Other than
Baits - Answer -✔✔Removal of all cellulosic material from under the building

, Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of of an approved termiticide

Post Construction Termiticide Bait Application for Subterranean Termites - Answer -
✔✔Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Install/service an approved baiting system

Pre-Construction Termiticide Bait Application for Subterranean Termites - Answer -
✔✔Systems must be monitored for one year at no additional cost when installed for pre-
construction or to control infestations found during the coverage period of an official
Georgia Wood Infestation Inspection Report.

Alternate Application Techniques (AAT) - Answer -✔✔AATs must be approved by the
commission prior to use
Removal of all cellulosic material from under the building
Removal of all wood to earth contacts except pressure treated wood designed for
ground contact
Removal of all visible and accessible termite tunnels
Application of an approved soil termiticide, where application includes all areas
specified in defined, comprehensive, or pre-construction treatments

Treatment of Powder Post Beetles and Wood Borers - Answer -✔✔Application of an
approved pesticide
Ventilation of the under-floor space between the bottom of the floor joists and the earth
to meet the requirements of the International Residential Building Code for one and two
family dwellings

Treatment of Wood Decay Fungi - Answer -✔✔Ventilation of the under-floor space
between the bottom of the floor joists and the earth to meet the requirements of the
International Residential Building Code for one and two family dwellings
Installation of a vapor barrier to cover a minimum of 70% of the exposed soil surface in
a crawl space

Treatment of Dry Wood Termites - Answer -✔✔Application of an approved pesticide

Treatment of Schools - Answer -✔✔Treatment of Schools involves taking special
precautions to minimize the potential exposure of students to pesticides.
-Application of pesticides in rooms vacant for 3+ hours
-Applications of bait formulations, rodenticide baits in tamper-resistant containers,
insecticides when students not in the room.

Document information

Uploaded on
January 16, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
88
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions