Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

EXAM STUDYGUIDE: NY HOME IMPROVEMENT CONTRACTOR 2025/2026, WITH CORRECT/ACCURATE ANSWERS

Document preview thumbnail
Preview 2 out of 10 pages

EXAM STUDYGUIDE: NY HOME IMPROVEMENT CONTRACTOR 2025/2026, WITH CORRECT/ACCURATE ANSWERS

Content preview

EXAM STUDYGUIDE: NY HOME
IMPROVEMENT CONTRACTOR
2025/2026, WITH
CORRECT/ACCURATE ANSWERS


What is "home improvement" (H.I.)? (C R R R R A A I) - CORRECT
ANSWERS- the construction, repair, remodeling, alteration,
rehabilitation, renovation, improvement, or addition to any land or
building used as a residence or dwelling place.



In what form must a home improvement contract be? - CORRECT
ANSWERS- Every home improvement contract must be in writing
and signed by everyone involved.



When must the consumer receive a completed, legible copy of the
H.I. contract? - CORRECT ANSWERS- At the time of signing and
before any work is done.



Does the H.I. contract have to be in englsh? - CORRECT
ANSWERS- Yes, unless another language was used in any oral
(spoken) sales presentation, in which case the contract needs to
be in that language and in English.



If a consumer wants more work done beyond what's in the
original contract, what should a contractor do? - CORRECT

, ANSWERS- Provide a written amendment to the contract, which
both parties must sign.



What information should be at the heading of a H.I. contract? -
CORRECT ANSWERS- contractor's name, office address,
telephone number, and DCA license number and the
salesperson's name and DCA license number.



What dates should be on the H.I. contract? - CORRECT ANSWERS-
the contract date, approximate date when work will begin and
date to be substantially completed.



What costs must be included in the H.I. contract? - CORRECT
ANSWERS- labor and materials



What 3 notices must the H.I include? - CORRECT ANSWERS- If the
owner does not pay the contractor they may have a claim against
the owner, that the contractor is legally required to deposit all
payments received prior to completion or the contractor must
post a bond or contract of indemnity, and the cancellation notice
wording.



What schedule should be inclduded with the H.I. contract? -
CORRECT ANSWERS- Schedule of payments and the
work/services to be performed if the contract calls for incremental
payments.

Document information

Uploaded on
January 15, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Elitaa
3.4
(33)
Sold
228
Followers
28
Items
7652
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions