Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

ICC Permit Technician Questions With Complete Solutions.

Document preview thumbnail
Preview 2 out of 13 pages

ICC Permit Technician Questions With Complete Solutions.

Content preview

ICC Permit Technician Questions With Complete Solutions

A building code is adopted by a jurisdiction as Correct Answers
A law

A building official may issue a stop work notice when Correct
Answers code violations have not been corrected

A building permit is _____ Correct Answers A license to build

A building permit may be revoked for all of the following
reasons except_____ Correct Answers Disagreeing with the
code officials interpretation

A building used for assembly purposes with an occupant load of
less than 50 persons shall be considered a Group _____
occupancy. Correct Answers B

A cross section view of a building is also known as a _____
Correct Answers Transverse section

A drwaing showing a particular building element on a larger
scale is known as a ____ Correct Answers Detail

A field correction notice informs the contractor of _____
Correct Answers What must be done to correct any violations
noted during inspection

A legal document that regulates the construction of buildings
and structures Correct Answers A building code

, A model code cannot be adopted without Correct Answers
referencing the specific edition

A parcel of land bounded by a lot line or a designated portion of
a public right-of-way is known as a _____ Correct Answers
Site

A performance type code Correct Answers Allows flexibility,
provided the final outcome meets the code's intent

A prescriptive code Correct Answers Describes exactly what
methods and materials are to be used during construction

A public park is permitted in a(n) _____ zoning district. Correct
Answers R-1

A reference symbol indicates _____ Correct Answers What
number the detail is and on what page it appears

A roof plan does not typically show Correct Answers Trusses
or rafters

A site plan does not typically show _____ Correct Answers
Finished roof elevation

A written description that spells out the qualitative requirements
for products, materials and workmanship including installation,
testing & performance criteria for a proposed project is known
as ________. Correct Answers Specification

Document information

Uploaded on
January 13, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Demetrius
4.4
(88)
Sold
261
Followers
159
Items
4587
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions