• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

Con 367 Exam 1 With Complete Solution

Document preview thumbnail
Preview 2 out of 10 pages

Con 367 Exam 1 With Complete Solution...

Content preview

Con 367 Exam 1 With
Complete Solution

Professional CM (Agency CM) - ANSWER Which one of the following is not a
Project Delivery System?

In lump-sum contracts, the Owner assumes the risk of cost. - ANSWER False

Typically, the Design Reviewer has the ultimate responsibility and authority
to make executive decisions related to matters affecting time and money in a
construction project. - ANSWER False

In the Design-Build project delivery system, the Owner has separate contracts
with the Designer and the Contractor. - ANSWER False

The Resident Project Representative should stop the work of the Contractor
when the work is not performed according to the drawings and
specifications. - ANSWER False

Which of the following should not be performed by the Resident Project
Representative for inspections? - ANSWER Providing instructions directly to
subcontractors

Which of the following is not true for the construction diary? - ANSWER
Entries should be made on a weekly basis (i.e., at the end of each week)

Ambiguous language in a contract is interpreted against the party who
selected the language or supplied the contract. - ANSWER True

, According to Spearin Doctrine, when the contractor exactly follows the detail
specifications and drawings, she/he will not be responsible for unsatisfactory
results in the end product. - ANSWER True

Shop drawings can be used as change orders. - ANSWER False

Which one of the following is not an element of the Contract as we discussed
in class? - ANSWER (Promise)

Offer

Acceptance

Consideration

Which of the following is not a condition where a contract will not be
enforced by courts? - ANSWER Seniority

Fill in the blank in the following statement: Some contracts must be in
writing under the ____________ as adopted by each state. - ANSWER Statute of
Frauds

RFI (Request for Information) is the document that is transmitted to the
General Contractor from the Designer to get clarifications with respect to
design drawings and specifications. - ANSWER False

The resident project representative should not supervise, direct, or control
the contractor's means and methods of performing work. - ANSWER True

In fast-track projects with multiple contractors, the services of a professional
construction management firm (Agency CM) are essential. - ANSWER True

A professional construction management firm (Agency CM) can participate in
the following phases of a project: - ANSWER Conception, Program Planning,

Document information

Uploaded on
January 11, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Newsolution
3.9
(59)
Sold
306
Followers
196
Items
2582
Last sold
3 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions