Failure to maintain OSHA logs could result in a base penalty of ? - Answers- $1000
The minimum number of employees that will require a contractor to obtain workmen's
compensation insurance is ? - Answers- 1 employee
The type of bond that guarantees that the contractor is I'll perform the work in
accordance with the contract is know as a ? bond - Answers- Performance Bond
Short term project schedule is detailed explanation of the next two weeks of
construction activities and should be developed and or reviewed by all the following
except ? - Answers- Architect
The ? usually prepares the project schedule - Answers- Project manager
In order to provide adequate control the project schedule should be formally reviewed
and updated - Answers- At least once every 30 days
A contract will not be enforced if it is ? - Answers- Illegal
According to the statute of frauds a contract need not be in writing and still be
enforceable in Florida if it is ? - Answers- Less than $500 in value and less than 1 year
in length
The ? has the duty to record and post a Notice of Commencement to improve real
property - Answers- Owner
A subcontractor started work on his contract with the General Contractor on August 1
1999 The owner made the final payment to the general contractor on September 13
1999 The latest date the subcontractor can serve a notice to preserve his claim under
the Conatitution Lein Law is what date and when ? - Answers- September 13 1999 or
day before payment
The type of contract we are in the contractor agrees to carry out stipulated job in
exchange for a fix some of the money is a? Contract - Answers- Lump sum
When a contractor has to perform extra work for a subcontractor he will recover the cost
in the form of a? - Answers- Back charge
The ? Should be jointly prepared with the material and equipment schedule - Answers-
Project schedule
, Based on the completed contract method for a job bid at $300,000 and currently
66.67% complete with a gross profit of 16.67% ($50,000) the current amount of profit
recognized would be ? - Answers- $0
Prior to the beginning a drug test program an employer shall ensure that at least ? days
elapse between the notice and the start of testing - Answers- 60 days
A lien that is properly perfected may be discharged by Amy of the filling except ? -
Answers- The completion of the project
After relocating his business to a new location the contractor has _____ days to notify
the Board of his new address - Answers- 45 days
______ days is the maximum time after commencing construction for the contractor to
give notice to the owner of his lien rights - Answers- 45 days
And action for the breach of a written contract must be brought within ______ years -
Answers- 5 years
All of the following must follow OSHA regulations standards except _____
establishments - Answers- Religious
The type of estimate that provides precise statements of quantities of materials,
equipment, and man power is considered to be a ______ - Answers- Detailed estimate
When preparing an equipment estimate ________ would not need to be evaluated -
Answers- Safety factors involved
Under the completed contract method the contractor may realize the profit ______ -
Answers- When the project is nearly complete
Which of the following is a non-recordable work related injury according to OSHA? -
Answers- Tetanus shot
For a labor (man power) estimate, there are various factors which affect production and
would include all the following except? - Answers- Supervision available on site
What type of insurance that covers the contractor for losses of material in transit to the
job site is known as? - Answers- Builders risk
A general contractor it mean to which of the following according to the license law
requirements on a residential property? - Answers- Construct a main sewer collection
system
Drug-free workplace programs are generally implemented by an employer to help
improve their safety record. If an employer wishes to institute a drug-free work place
ANSWERS
Failure to maintain OSHA logs could result in a base penalty of ? - Answers- $1000
The minimum number of employees that will require a contractor to obtain workmen's
compensation insurance is ? - Answers- 1 employee
The type of bond that guarantees that the contractor is I'll perform the work in
accordance with the contract is know as a ? bond - Answers- Performance Bond
Short term project schedule is detailed explanation of the next two weeks of
construction activities and should be developed and or reviewed by all the following
except ? - Answers- Architect
The ? usually prepares the project schedule - Answers- Project manager
In order to provide adequate control the project schedule should be formally reviewed
and updated - Answers- At least once every 30 days
A contract will not be enforced if it is ? - Answers- Illegal
According to the statute of frauds a contract need not be in writing and still be
enforceable in Florida if it is ? - Answers- Less than $500 in value and less than 1 year
in length
The ? has the duty to record and post a Notice of Commencement to improve real
property - Answers- Owner
A subcontractor started work on his contract with the General Contractor on August 1
1999 The owner made the final payment to the general contractor on September 13
1999 The latest date the subcontractor can serve a notice to preserve his claim under
the Conatitution Lein Law is what date and when ? - Answers- September 13 1999 or
day before payment
The type of contract we are in the contractor agrees to carry out stipulated job in
exchange for a fix some of the money is a? Contract - Answers- Lump sum
When a contractor has to perform extra work for a subcontractor he will recover the cost
in the form of a? - Answers- Back charge
The ? Should be jointly prepared with the material and equipment schedule - Answers-
Project schedule
, Based on the completed contract method for a job bid at $300,000 and currently
66.67% complete with a gross profit of 16.67% ($50,000) the current amount of profit
recognized would be ? - Answers- $0
Prior to the beginning a drug test program an employer shall ensure that at least ? days
elapse between the notice and the start of testing - Answers- 60 days
A lien that is properly perfected may be discharged by Amy of the filling except ? -
Answers- The completion of the project
After relocating his business to a new location the contractor has _____ days to notify
the Board of his new address - Answers- 45 days
______ days is the maximum time after commencing construction for the contractor to
give notice to the owner of his lien rights - Answers- 45 days
And action for the breach of a written contract must be brought within ______ years -
Answers- 5 years
All of the following must follow OSHA regulations standards except _____
establishments - Answers- Religious
The type of estimate that provides precise statements of quantities of materials,
equipment, and man power is considered to be a ______ - Answers- Detailed estimate
When preparing an equipment estimate ________ would not need to be evaluated -
Answers- Safety factors involved
Under the completed contract method the contractor may realize the profit ______ -
Answers- When the project is nearly complete
Which of the following is a non-recordable work related injury according to OSHA? -
Answers- Tetanus shot
For a labor (man power) estimate, there are various factors which affect production and
would include all the following except? - Answers- Supervision available on site
What type of insurance that covers the contractor for losses of material in transit to the
job site is known as? - Answers- Builders risk
A general contractor it mean to which of the following according to the license law
requirements on a residential property? - Answers- Construct a main sewer collection
system
Drug-free workplace programs are generally implemented by an employer to help
improve their safety record. If an employer wishes to institute a drug-free work place