• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Florida Electrical Business Questions And Answers

Document preview thumbnail
Preview 2 out of 5 pages

FLORIDA ELECTRICAL BUSINESS QUESTIONS AND ANSWERS

Content preview

FLORIDA ELECTRICAL BUSINESS QUESTIONS AND
ANSWERS
Failure to maintain OSHA logs could result in a base penalty of ? - Answers- $1000

The minimum number of employees that will require a contractor to obtain workmen's
compensation insurance is ? - Answers- 1 employee

The type of bond that guarantees that the contractor is I'll perform the work in
accordance with the contract is know as a ? bond - Answers- Performance Bond

Short term project schedule is detailed explanation of the next two weeks of
construction activities and should be developed and or reviewed by all the following
except ? - Answers- Architect

The ? usually prepares the project schedule - Answers- Project manager

In order to provide adequate control the project schedule should be formally reviewed
and updated - Answers- At least once every 30 days

A contract will not be enforced if it is ? - Answers- Illegal

According to the statute of frauds a contract need not be in writing and still be
enforceable in Florida if it is ? - Answers- Less than $500 in value and less than 1 year
in length

The ? has the duty to record and post a Notice of Commencement to improve real
property - Answers- Owner

A subcontractor started work on his contract with the General Contractor on August 1
1999 The owner made the final payment to the general contractor on September 13
1999 The latest date the subcontractor can serve a notice to preserve his claim under
the Conatitution Lein Law is what date and when ? - Answers- September 13 1999 or
day before payment

The type of contract we are in the contractor agrees to carry out stipulated job in
exchange for a fix some of the money is a? Contract - Answers- Lump sum

When a contractor has to perform extra work for a subcontractor he will recover the cost
in the form of a? - Answers- Back charge

The ? Should be jointly prepared with the material and equipment schedule - Answers-
Project schedule

, Based on the completed contract method for a job bid at $300,000 and currently
66.67% complete with a gross profit of 16.67% ($50,000) the current amount of profit
recognized would be ? - Answers- $0

Prior to the beginning a drug test program an employer shall ensure that at least ? days
elapse between the notice and the start of testing - Answers- 60 days

A lien that is properly perfected may be discharged by Amy of the filling except ? -
Answers- The completion of the project

After relocating his business to a new location the contractor has _____ days to notify
the Board of his new address - Answers- 45 days

______ days is the maximum time after commencing construction for the contractor to
give notice to the owner of his lien rights - Answers- 45 days

And action for the breach of a written contract must be brought within ______ years -
Answers- 5 years

All of the following must follow OSHA regulations standards except _____
establishments - Answers- Religious

The type of estimate that provides precise statements of quantities of materials,
equipment, and man power is considered to be a ______ - Answers- Detailed estimate

When preparing an equipment estimate ________ would not need to be evaluated -
Answers- Safety factors involved

Under the completed contract method the contractor may realize the profit ______ -
Answers- When the project is nearly complete

Which of the following is a non-recordable work related injury according to OSHA? -
Answers- Tetanus shot

For a labor (man power) estimate, there are various factors which affect production and
would include all the following except? - Answers- Supervision available on site

What type of insurance that covers the contractor for losses of material in transit to the
job site is known as? - Answers- Builders risk

A general contractor it mean to which of the following according to the license law
requirements on a residential property? - Answers- Construct a main sewer collection
system

Drug-free workplace programs are generally implemented by an employer to help
improve their safety record. If an employer wishes to institute a drug-free work place

Document information

Uploaded on
January 9, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(367)
Sold
2183
Followers
1449
Items
61377
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions