Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

NICET Level 1 Highway Construction – Questions And Complete Solutions

Document preview thumbnail
Preview 2 out of 9 pages

NICET Level 1 Highway Construction – Questions And Complete Solutions

Content preview

NICET Level 1 Highway Construction – Questions And
Complete Solutions

Acceptance Right Ans - The written acceptance by the Department of the
Work.

acceptance testing Right Ans - Testing conducted by the Department to
measure the degree of compliance to the Contract

actual cost Right Ans - The computed cost using calculations provided

addendum Right Ans - A Contract revision or response to a Contractor
inquiry issued after advertisement and before the opening of bids.

as-built quantity Right Ans - The quantity of a completed Item eligible for
payment

authorized funding amount Right Ans - The amount of funds authorized by
the Department for the Contract

Bidder Right Ans - The individual, firm, partnership, corporation, joint
venture, or any acceptable combination thereof that submits a bid to the
Department.

bridge Right Ans - . A structure, other than a culvert, including supports,
erected over a depression or an obstruction, such as water, highway, or
railway, and having a track or passageway for carrying traffic or other moving
loads and having a length 3 measured along the center of the structure of
more than 20 feet between undercopings of abutments or extreme ends of
openings for multiple boxes. Structure dimensions are defined as follows:

bridge length Right Ans - The overall length measured along the line of
survey stationing from back to back of backwalls of abutments, if present,
otherwise end to end of the bridge floor; but, in no case less than the total
clear opening of the structure

bridge width Right Ans - The clear width measured at right angles to the
longitudinal centerline of the bridge between the bottom of curbs, or in the

, case of multiple height of curbs, between the bottoms of the lower risers or, if
curbs are not used, between inner faces of parapet or railing

Change Order. Right Ans - A written order issued by the Department to the
Contractor after execution of the Contract authorizing one or more of the
following: 1. Changes in the Work. 2. Modifications in the basis of payment. 3.
Modifications to Contract Time.

Commercially Useful Function Right Ans - Occurrences in which the
subcontractor is responsible for the execution of a distinct element of the
work of a contract and carrying out its responsibilities by actually performing,
managing, and supervising the work involved, and with respect to materials
and supplies used on the contract, prepares the estimate, negotiates price,
determines quality and quantity, orders the material, arranges delivery,
installs (where applicable), and pays for the material and supplies itself for
the project.

Completion Right Ans - When all of the following have occurred: 1. The
Work has been satisfactorily completed in all respects according to the
Contract. 2. The Project is ready for use by the Department as required by the
Contract. 3. The Contractor has satisfactorily executed and delivered to the RE
all documents, certificates, and proofs of compliance required by the Contract
including the Notice of Completion.

construction operations Right Ans - Physical work done in the performance
of the Contract within the Project Limits. Does not include off-site
mobilization, procurement and off-site storage of materials and plants,
engineering, performance bond and payment bond, surveys, working
drawings, off-site field offices, schedules, certificates, forms, or documents

Contract Right Ans - The written integrated agreement between the
Department and the Contractor setting forth the obligations of the parties,
including, but not limited to, the performance of the Work and the basis of
payment. It includes the advertisement, Proposal, Certification as to
Publication and Notice of Advertisement for Proposal, bid, Appointment of
Agent by Nonresident Contractors, Resolution of Award of Contract, Executed
Form of Contract, performance and payment bonds, Specifications, Plans,
Right-of-Way Plans, permits, boring logs, pavement core records, addenda,

Document information

Uploaded on
January 9, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LeCrae
4.0
(445)
Sold
2127
Followers
1409
Items
22363
Last sold
1 hour ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions