LOG-2150-Introduction-to-Technical-Data-Management-Module-2-Exam Answered. What three items must the Integrated Product Team (IPT) data call participants base their technical data requirements on? Life cycle phase of the program Purpose of the contract Program Management Strategy documents () Price of the contract What type of improper marking is a noncommercial technical drawing with the marking of ‘Company Confidential'? O Export Control O Unjustified Nonconforming O Distribution Statement Who places the data rights markings on the noncommercial technical data? O The Government Contracting Officer (O Both the Contractor and the Government Program Office () The Government Program Office The Contractor Which individual performs inspections, acceptance, and storage of data? O Product Support Manager (PM) (O Contracting officer @® Data Manager (O Subject Matter Expert (SME) What three documents should the Subject Matter Experts (SME) review to start determining the technical data needed for the acquisition program in Step 1 of the High-Level Contract Data Requirements List (CDRL) Planning Tool? [ Program Protection Plan Life Cycle Sustainment Plan System Engineering Plan Acquisition Strategy What are three Data Requirements Review Board (DRRB)-recommended activities? O Require the contractor to use Government format. Consider whether red-line updates will suffice. Balance among competing program objectives. Use preliminary or informal data to meet initial needs. Which two steps must occur before the Integrated Product Team (IPT) data call? Subject Matter Expert (SME) review of the program'’s strategy documents (] Data Item Descriptions (DID) selection and tailoring Completing a Work Breakdown Structure (WBS) to a Level 3 (] Data Requirements Review Board (DRRB) meeting The Subject Matter Experts (SME) on the Integrated Product Team (IPT) will review requirement and acquisition documentation to determine which three of the following? For what purpose technical data is needed (L) where technical data will come from What technical data is necessary How long the technical data is needed In Step 2 of the High-Level Contract Data Requirements List (CDRL) Planning Tool Process, the Government engineering team will develop the Work Breakdown Structure (WBS) elements of the weapon system to which level? O s O 1 O 2 3 During which step of the High-Level Contract Data Requirements List (CDRL) Planning Tool Process do the Program Management Office (PMO)/Integrated Product Team (IPT) members review all the data markings for each technical data delivered by the CDRL? @® 7 Oe O 4 Os Which individual is in charge of ensuring the necessary and proper technical data is procured? (O Contracting officer O Subject Matter Experts (SME) Product Support Manager (PSM) (O Data Manager What are three things that the Data Requirements Review Board (DRRB) ensures? (] ANl Data Item Descriptions (DID) referenced are unique, program-specific, and approved by the Data Requirements Review Board (DRRB). Data requirements are clearly stated in the Statement of Work (SOW)/Performance Work Statement (PWS). Intended users agree with technical data requirements of the proposed procurement. Approval requirements, delivery dates, and deferred delivery of technical data are reasonable, consistent with the program schedule, and properly specified. What is used to tailor a Data Item Description (DID)? O statement of Work (SOW) Exhibit A O The Acquisition Streamlining and Standardization Information System (ASSIST) database (O The Work Breakdown Structure (WBS) Contract Data Requirements List (CDRL) Block 16 The Work Breakdown Structure (WBS) performs which three of the following functions? Segregates a defense materiel item into its common parts Clarifies the tasks to be completed to each defense materiel item part and the end item or weapon system Clarifies the relationship of a defense materiel item’s parts [ Obtains necessary and proper technical data

Show more Read less








Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
January 7, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • log 2150 module 2 exam

Content preview

What Technical-Associated Information data is provided during Technology Maturation and Risk Reduction (TMRR) phase? (Select two.)

Configuration Control initial report
() Final engineering drawings
Developmental Test Reports
[ Final computer software manuals
What are two benefits with cloud storage of technical data?

() No cost to store technical data in a cloud database
Enables innovation
Physical housing of technical data is becoming obsolete and very expensive
() No risk to store technical data in a cloud database

For Rapid Fielding, what type of technical data would be required?

O Research and Development technical data
(O Applied research
@® Technical data that would require minimal development
O Basic research
What is Performance-Based Logistics (PBL) based on that can reduce the need for technical/logistics data?

@® Outcomes and not outputs
O Inputs and outputs
O Outputs and not outcomes
O Outcomes and outputs
What are two requirement information documents are needed for the Materiel Solution Analysis (MSA) phase?

Draft Capabilities Development Document (CDD)
() Intellectual Property (IP) Strategy
(] Life Cycle Sustainment Plan (LCSP)
Initial Capabilities Document (ICD)

What does rapid development necessitate in terms of the technical data approach?

OA rigid technical data approach which locks down system and product support configurations early in the design process
OA hybrid technical data approach which locks down as many elements as possible as early as possible
@® A flexible technical data approach which does not lock down system and product support configurations
(O Ahands-off technical data approach which acknowledges that there is no way to lock down system and product support when using rapid development

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Topscorer london
View profile
Follow You need to be logged in order to follow users or courses
Sold
116
Member since
5 year
Number of followers
13
Documents
454
Last sold
6 hours ago
Top Scorer

Helping all Students fulfill their educational, career and personal goals.

4.3

24 reviews

5
16
4
3
3
3
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions