Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

FDOT EARTHWORK LEVEL 1 EXAM QUESTIONS | TESTED AND TRIED ANSWERS | LATEST UPDATE 2024/2025 100% (GRADE A+)

Document preview thumbnail
Preview 3 out of 18 pages

FDOT EARTHWORK LEVEL 1 EXAM QUESTIONS | TESTED AND TRIED ANSWERS | LATEST UPDATE 2024/2025 100% (GRADE A+)FDOT EARTHWORK LEVEL 1 EXAM QUESTIONS | TESTED AND TRIED ANSWERS | LATEST UPDATE 2024/2025 100% (GRADE A+)

Content preview

FDOT EARTHWORK LEVEL 1 EXAM QUESTIONS | TESTED
AND TRIED ANSWERS | LATEST UPDATE 2024/2025
100% (GRADE A+)
Basics covered in Level 1


Ans>> Nuclear Testing


Speedy Moisture


Report Forms




Earthwork has to do with the roadway in what way?


Ans>> Earthwork is the excavation and placement of soils and materials supporting the

proposed roadway.




In Earthwork what is a lift?


Ans>> 6" of compacted depth at full width




In Earthwork what is a Lot?


Ans>> A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are

separate lots.




1

,Sampling at the roadway is done for


Ans>> Done for base, sub grade, and embankment.




Sampling is determined how


Ans>> generated with random numbers usually by a Verification Inspector




What is important about sampling at the roadway


Ans>> Minimum of three representative sample combined.




What is LIMS?


Ans>> Laboratory Info Management System




The proctor theory is when compaction is achieved how


Ans>> by inputting energy to expel air and water in the soil voids




Compaction causes


Ans>> An increase in unit weight, decrease in compressibility and permeability.




2

, The proctor is determined where and creates what


Ans>> In a laboratory and establishes a density standard to be used on the roadway




Lab proctors are created how


Ans>> Material is gathered from the road and prepared with different amounts of water then

placed in molds and hammered




What is a modified proctor used in


Ans>> It is used in base, sub grade, MSE wall back fill materials




Modified proctors are created how


Ans>> With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in

total.




What is a standard proctor used in


Ans>> It is used in embankment and structure back fill materials




Standard proctors are created how


3

Document information

Uploaded on
January 6, 2025
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
343
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions