DVP SWPPP Questions With Answers Latest Update
DVP SWPPP Questions With Answers
Latest Update.
The 1970s law that set into place the regulation of stormwater is - ✔✔✔ - The clean water act
Requirements for managing stormwater activity on a construction site are outlined in the following
regulation - ✔✔✔ - NPDES
Which of the following is never an allowable stormwater discharge from a construction site - ✔✔✔ -
Discharge from contaminated ground water
The notice of termination can be filed when - ✔✔✔ - All construction activity, inside and outside of the
building, is complete and permanent stabilization has been verified as adequate to meet permit
requirements
Relative to stormwater permitting all of the following must occur before construction starts except -
✔✔✔ - Submit the notice of termination (NOT)
The stormwater notice of intent (NOI) must be submitted - ✔✔✔ - After the SWPPP is prepared and
before starting construction
Potential pollutant sources stored on a construction site may include - ✔✔✔ - 1. Petroleum storage
tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
The SWPPP inflammation sequence may be modified - ✔✔✔ - After consulting with the project SWPPP
Designer (CEC) and, if required, the project owner and receiving written approval
©®™ Page 1
, DVP SWPPP Questions With Answers Latest Update
A SWPPP site map will show all of the following except - ✔✔✔ - Notices of violation
Which of the following information is to be posted at the entrance of the site - ✔✔✔ - 1. Construction
site notice
2. Permit authorization
3. Location of SWPP
4. ALL OF THE ABOVE
Which of the following is NOT A beneficial use of water - ✔✔✔ - Flushing a spill down a storm drain
When installing and maintaining a check dam make sure - ✔✔✔ - The low point (overflow) of the
check dam is in the middle of the channel
To reduce the possibility of undercutting in channels, you should - ✔✔✔ - Install filter fabric under rock
and similar materials placed within the stormwater conveyance
The good housekeeping section of the SWPP must include all BUT which of the following - ✔✔✔ - Post
construction stormwater management procedures
Runoff controls include all but which of the following - ✔✔✔ - Rolled erosion control products
Which erosion control best management practice increases water filtration, dissipates rainfall energy
and slows over flow of stormwater - ✔✔✔ - Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most control over
(only select one) is - ✔✔✔ - Groundcover
©®™ Page 2
DVP SWPPP Questions With Answers
Latest Update.
The 1970s law that set into place the regulation of stormwater is - ✔✔✔ - The clean water act
Requirements for managing stormwater activity on a construction site are outlined in the following
regulation - ✔✔✔ - NPDES
Which of the following is never an allowable stormwater discharge from a construction site - ✔✔✔ -
Discharge from contaminated ground water
The notice of termination can be filed when - ✔✔✔ - All construction activity, inside and outside of the
building, is complete and permanent stabilization has been verified as adequate to meet permit
requirements
Relative to stormwater permitting all of the following must occur before construction starts except -
✔✔✔ - Submit the notice of termination (NOT)
The stormwater notice of intent (NOI) must be submitted - ✔✔✔ - After the SWPPP is prepared and
before starting construction
Potential pollutant sources stored on a construction site may include - ✔✔✔ - 1. Petroleum storage
tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
The SWPPP inflammation sequence may be modified - ✔✔✔ - After consulting with the project SWPPP
Designer (CEC) and, if required, the project owner and receiving written approval
©®™ Page 1
, DVP SWPPP Questions With Answers Latest Update
A SWPPP site map will show all of the following except - ✔✔✔ - Notices of violation
Which of the following information is to be posted at the entrance of the site - ✔✔✔ - 1. Construction
site notice
2. Permit authorization
3. Location of SWPP
4. ALL OF THE ABOVE
Which of the following is NOT A beneficial use of water - ✔✔✔ - Flushing a spill down a storm drain
When installing and maintaining a check dam make sure - ✔✔✔ - The low point (overflow) of the
check dam is in the middle of the channel
To reduce the possibility of undercutting in channels, you should - ✔✔✔ - Install filter fabric under rock
and similar materials placed within the stormwater conveyance
The good housekeeping section of the SWPP must include all BUT which of the following - ✔✔✔ - Post
construction stormwater management procedures
Runoff controls include all but which of the following - ✔✔✔ - Rolled erosion control products
Which erosion control best management practice increases water filtration, dissipates rainfall energy
and slows over flow of stormwater - ✔✔✔ - Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most control over
(only select one) is - ✔✔✔ - Groundcover
©®™ Page 2