Concrete Batch Plant Operator Exam Questions and Answers Latest Update 2025 Stockpiles of aggregate shall be maintained in a well-drained condition in order to: - Answers Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? - Answers 24 Free moisture of the aggregate means: - Answers Moister on the surface of an aggregate that is above and beyond the absorbed moister in the aggregate. If the moister test is done other than by the cook-out method, how often shall the other methods be verified? - Answers Each week For drill shaft concrete, the quantity of cement replaced with fly ash shall be: - Answers 33 thru 37% In concrete, which material has a specific gravity of one? - Answers Water What is the air content range for all classes of structural concrete except Class IV Shaft? - Answers 1.00 thru 6.00% When can unmetered water be added to the concrete? - Answers Not at all. Do not allow the total number of revolution at mixing speed to exceed: - Answers 160 Revolutions After all materials have been charged into the transit mixer drum, the concrete must be mixed at how many revolutions at the plant before leaving for the project? - Answers 70 to 100 When the water meters / scales are calibrated, prior to production, at what frequency should they be checked there after? - Answers 3 moths To what accuracy should the scales for weighing cement , pozzolan, slag and aggregates at the plant be maintained - Answers 0.5% of maximum load normally handled For concrete containing a water-reducing retarding admixture, in an agitator truck, the maximum time for depositing the concrete shall not exceed: - Answers 90 minutes If a load of concrete has been rejected due to excessive slump, the concrete may remain in the transporting vehicle to reduce the slump. - Answers Is not allowed. Who places the orders for concrete with the producer? - Answers The contractor The minimum normal sampling frequency for the chloride content of structural concrete is: - Answers 1 per design mix in use from the first day of production and every 30 calendar days or less thereafter. In what moister condition are the aggregates on the approved concrete mix designs? - Answers SSD condition

Show more Read less
Institution
Concrete Batch Plant Operator
Course
Concrete Batch Plant Operator








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Concrete Batch Plant Operator
Course
Concrete Batch Plant Operator

Document information

Uploaded on
December 31, 2024
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Concrete Batch Plant Operator Exam Questions and Answers Latest Update 2025



Stockpiles of aggregate shall be maintained in a well-drained condition in order to: - Answers Minimize
Free Water Content

Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? -
Answers 24

Free moisture of the aggregate means: - Answers Moister on the surface of an aggregate that is above
and beyond the absorbed moister in the aggregate.

If the moister test is done other than by the cook-out method, how often shall the other methods be
verified? - Answers Each week

For drill shaft concrete, the quantity of cement replaced with fly ash shall be: - Answers 33 thru 37%

In concrete, which material has a specific gravity of one? - Answers Water

What is the air content range for all classes of structural concrete except Class IV Shaft? - Answers 1.00
thru 6.00%

When can unmetered water be added to the concrete? - Answers Not at all.

Do not allow the total number of revolution at mixing speed to exceed: - Answers 160 Revolutions

After all materials have been charged into the transit mixer drum, the concrete must be mixed at how
many revolutions at the plant before leaving for the project? - Answers 70 to 100

When the water meters / scales are calibrated, prior to production, at what frequency should they be
checked there after? - Answers 3 moths

To what accuracy should the scales for weighing cement , pozzolan, slag and aggregates at the plant be
maintained - Answers 0.5% of maximum load normally handled

For concrete containing a water-reducing retarding admixture, in an agitator truck, the maximum time
for depositing the concrete shall not exceed: - Answers 90 minutes

If a load of concrete has been rejected due to excessive slump, the concrete may remain in the
transporting vehicle to reduce the slump. - Answers Is not allowed.

Who places the orders for concrete with the producer? - Answers The contractor

The minimum normal sampling frequency for the chloride content of structural concrete is: - Answers 1
per design mix in use from the first day of production and every 30 calendar days or less thereafter.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
347
Member since
1 year
Number of followers
16
Documents
29016
Last sold
1 week ago
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

55 reviews

5
19
4
14
3
12
2
0
1
10

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions