How long are engineering legal records retained onboard for? - Answers 3 years
How long are operational logs maintained for? - Answers 6 months
what is the record where all speed changes for each individual shaft are recorded? - Answers bell book
what log is maintained in dc central - Answers damage control closure log
What log records day to day events in the engineering plant - Answers the engineering log
responsible for physical security of the main reduction gear? - Answers engineer officer
watch fire and flooding get reported to - Answers sounding and security watch
in port watch in charge of physical security of the ship and takes control of security forces - Answers
CDO
What program is used to safeguard the ship from sabotage? - Answers physical security program
What device is a positive stop used to prevent inadvertent manipulation? - Answers a locking device
the use of EOSS is - Answers mandatory
What are the 3 parts of an EOSS? - Answers the EOSS users guide, EOP, EOCC
What 2 actions of the EOCC that must be memorized - Answers controlling and immediate actions
4 actions EOCC - Answers controlling, immediate, supplementary, restore casualty
used to alert personnel to an action that if not strictly adhered to may result in injury to personnel -
Answers warning
who uses master plant procedures - Answers EOOW, OOD, SPACE SUPERVISOR
table that displays proper valve alignment for various tanks - Answers tank tables
What part of EOP provides tank capacities - Answers tank status diagram
What document provides standardized procedures tailored to each ship - Answers EOSS
What chart helps keep track of what equipment is on line - Answers status chart
why is oil in bilges considered hazardous - Answers generate vapors that can ignite with a spark or open
flame
parts per million of oily waste that is sufficient to cause a sheen - Answers 15-20
, Mark 2 spill kit location - Answers main deck
complete discontinuation of all discharges of oily waste - Answers OPA
manual details safety precautions for handling asbestos - Answers asbestos control program
how long is a gas free certificate good for - Answers 8 hours
document posted at entrance of any tank or void not normally manned - Answers gas free certificate
ORM stands for - Answers operational risk management
5 steps of ORM - Answers identify, assess, making risk decisions, implement controls, supervise
material used to seal moving joints - Answers packing
material used to seal fixed joints - Answers gasket
high temp, high pressure - Answers raised face
low temp, low pressure - Answers flat face
What digit in 4 digit symbol indicates if material is used for a mixed joint or moving joint - Answers 1st
digit
What is the purpose of the EOCC - Answers Procedures for responding to and controlling commonly
occurring casualties
What are the four basic actions of a casualty procedure - Answers Control actions
Immediate actions
Supplement actions
Restoration actions
Where is the master copy of the EOSS located on board your ship - Answers Engineering log room
What is the difference between simplex gauge and a duplex gauge? - Answers Simplex one bourbon
tube, one needle, the displayed pressure is from one connection
Duplex two bourbon tubes, two needles and the displayed pressure is from two connections
What is the purpose of the gauge calibration program? - Answers To ensure gauge calibrations is within
the prescribe limitations with the least amount of equipment down time
What is the purpose of the differential tube diagram - Answers To measure the difference in pressure
from two different locations