CDS - Exam 1 Practice Questions and Answers 100% Pass Labor and material payment bonds provide the necessary protection on public projects - TRUE Miller act corresponds with what.? - Labor and material payment bond Architects should not advise owners and the legal sufficiency of required affidavits, waivers, or releases of liens. - TRUE Liens are not permitted on public projects. - TRUE Architect must review, approve, and promptly submit shop drawings required by the contract documents. - TRUE An architect approved shop drawings which deviated from the contract documents. - Changes in contract drawings must be submitted in writing to architect before becoming affective, not equal to revisions within shop drawings. Who is responsible for errors and omissions in shop drawings? - General Contractor Revisions not requested by the architect on resubmitted shop drawings don't require architect's approval? - FALSE A contractors stamp of approval on shop drawings means that the contractor has already determined all criteria related thereto. - FALSE AIA document B101 is used to outline the architects service obligations? - TRUE 2 | P a g e Created by Katelyn Whitman © 2025, All Rights Reserved. 100% PASS GUARANTEE The architects responsibilities are re-stated within the AIA General Conditions Doc A201. - TRUE Contractors may not know what services the architect is obligated to perform if what document is not part of the contract documents. - AIA Document B101 In review of shop drawings the general conditions Document A201 clearly states? - Matters outside the scope of the design concept and the contract documents are not reviewed. If an architect had performed their services using stipulations of AIA documents A201 & B141 within a ______ there should be no concern about professional liability. But general liability is different. - Standard of care Calendar days - 7 / Week Liquidated damages is a provision included in the? - Owner-contract

Content preview

1|Page




CDS - Exam 1 Practice Questions and
Answers 100% Pass

Labor and material payment bonds provide the necessary protection on public projects - ✔✔TRUE


Miller act corresponds with what.? - ✔✔Labor and material payment bond


Architects should not advise owners and the legal sufficiency of required affidavits, waivers, or releases

of liens. - ✔✔TRUE


Liens are not permitted on public projects. - ✔✔TRUE


Architect must review, approve, and promptly submit shop drawings required by the contract

documents. - ✔✔TRUE


An architect approved shop drawings which deviated from the contract documents. - ✔✔Changes in

contract drawings must be submitted in writing to architect before becoming affective, not equal to

revisions within shop drawings.


Who is responsible for errors and omissions in shop drawings? - ✔✔General Contractor


Revisions not requested by the architect on resubmitted shop drawings don't require architect's approval?

- ✔✔FALSE


A contractors stamp of approval on shop drawings means that the contractor has already determined all

criteria related thereto. - ✔✔FALSE


AIA document B101 is used to outline the architects service obligations? - ✔✔TRUE




Created by Katelyn Whitman © 2025, All Rights Reserved. 100% PASS GUARANTEE

, 2|Page


The architects responsibilities are re-stated within the AIA General Conditions Doc A201. - ✔✔TRUE


Contractors may not know what services the architect is obligated to perform if what document is not

part of the contract documents. - ✔✔AIA Document B101


In review of shop drawings the general conditions Document A201 clearly states? - ✔✔Matters outside

the scope of the design concept and the contract documents are not reviewed.


If an architect had performed their services using stipulations of AIA documents A201 & B141 within a

______ there should be no concern about professional liability. But general liability is different. -

✔✔Standard of care


Calendar days - ✔✔7 / Week


Liquidated damages is a provision included in the? - ✔✔Owner-contractor agreement. Document A101.


An amount of money stipulated in the contract that is chargeable against the contractor is reimbursement

for damages suffered by the owner because the contractors failure to fulfill his or her contractual

obligation's. - ✔✔Liquidated damages


What clause should be used when a slight delay in schedule can cause a breach of contract? - ✔✔Time is

of the essence


CPM is superior to a Bar Chart because it shows durations, sequences and relationships to other

activities. - ✔✔TRUE


And small projects what type of progress schedule should be used? - ✔✔Bar chart


And larger complex projects what type of progress schedule should be used? - ✔✔Critical path method

CPM


How many days the contractor have to notify the architect in conditions of force majeure? - ✔✔21 days




Created by Katelyn Whitman © 2025, All Rights Reserved. 100% PASS GUARANTEE

Document information

Uploaded on
December 22, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KatelynWhitman
3.6
(260)
Sold
1262
Followers
485
Items
43877
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions