What should the interior designer do at the conclusion of the design
development presentation and prior to beginning the contract
document phase?
A.
Assign action items and directives to team members and consultants.
B.
Submit an invoice for professional services completed to date.
C.
Issue formal notice-to-proceed documents to the client and
consultants.
D.
Obtain written client approval of all drawings and specifications. -
✔✔✔ Correct Answer > The correct answer is D. Common practice is
to gain written client approval of the final design presentation before
construction documents are prepared
,P6 Contract Administration
A final construction budget for an office remodeling project is 10%
higher than the client anticipated. What strategy would be MOST
effective in lowering the costs?
A. Ask the contractor to use less expensive substitutes.
B. Select less expensive finish materials.
C. Reevaluate the area requirements with the client.
D. Create a new, simpler space plan. - ✔✔✔ Correct Answer > The
correct answer is B. Finish materials comprise a large percentage of the
cost for an interior remodel. Savings can usually be found in finishes
without adversely affecting the function of the space. The designer will
want to maintain control of the final product and would not delegate
finish selections to a contractor. Changing the size and/or complexity of
the space would quite likely have an adverse effect on the final function
P4 Product and Material Coordination
What is the result of withholding external fresh air from an HVAC
system?
,A.
Unit efficiency is diminished
B.
VOC build-up becomes more concentrated
C.
Electrostatic filters are required
D.
Condensation builds up in the ducts - ✔✔✔ Correct Answer > The
correct answer is B. Adequate circulation of clean, fresh air in
combination with recirculated air is an important component in
developing satisfactory interior air quality and preventing the build-up
of interior air pollutants
P3 Building Systems and Integration
Which test is MOST important to review for performance when
specifying porcelain tile on a ramp surface?
A. ASTM Radiant Panel Test
B. ASTM Coefficient of Friction Test
C. California Technical Bulletin #117
D. California Technical Bulletin #133 - ✔✔✔ Correct Answer > The
correct answer is B. Ramps are hazardous and need increased friction
, to negotiate safely. The only test listed pertaining specifically to tile
flooring is "B".
P4 Product and Material Coordination
In which of the following applications is a Class C wall finish allowed by
code?
A.
An exit stairway enclosure
B.
A theater
C.
A hotel room
D.
A hospital room - ✔✔✔ Correct Answer > The correct answer is C. A
hotel room will not have a high occupancy load (like exit ways or
theaters) or incapacitated occupants (like a hospital room) and a hotel
room is not part of the means of egress; therefore lower class of
finishes is permitted.
P4 Product and Material Coordination
AND PRACTICAL EXAM (FULL VERSION) |
NEWEST ACTUAL EXAM COMPREHENSIVE
QUESTIONS AND VERIFIED ANSWERS
GRADED A+ | 100% PASS | 2025 UPDATE!
What should the interior designer do at the conclusion of the design
development presentation and prior to beginning the contract
document phase?
A.
Assign action items and directives to team members and consultants.
B.
Submit an invoice for professional services completed to date.
C.
Issue formal notice-to-proceed documents to the client and
consultants.
D.
Obtain written client approval of all drawings and specifications. -
✔✔✔ Correct Answer > The correct answer is D. Common practice is
to gain written client approval of the final design presentation before
construction documents are prepared
,P6 Contract Administration
A final construction budget for an office remodeling project is 10%
higher than the client anticipated. What strategy would be MOST
effective in lowering the costs?
A. Ask the contractor to use less expensive substitutes.
B. Select less expensive finish materials.
C. Reevaluate the area requirements with the client.
D. Create a new, simpler space plan. - ✔✔✔ Correct Answer > The
correct answer is B. Finish materials comprise a large percentage of the
cost for an interior remodel. Savings can usually be found in finishes
without adversely affecting the function of the space. The designer will
want to maintain control of the final product and would not delegate
finish selections to a contractor. Changing the size and/or complexity of
the space would quite likely have an adverse effect on the final function
P4 Product and Material Coordination
What is the result of withholding external fresh air from an HVAC
system?
,A.
Unit efficiency is diminished
B.
VOC build-up becomes more concentrated
C.
Electrostatic filters are required
D.
Condensation builds up in the ducts - ✔✔✔ Correct Answer > The
correct answer is B. Adequate circulation of clean, fresh air in
combination with recirculated air is an important component in
developing satisfactory interior air quality and preventing the build-up
of interior air pollutants
P3 Building Systems and Integration
Which test is MOST important to review for performance when
specifying porcelain tile on a ramp surface?
A. ASTM Radiant Panel Test
B. ASTM Coefficient of Friction Test
C. California Technical Bulletin #117
D. California Technical Bulletin #133 - ✔✔✔ Correct Answer > The
correct answer is B. Ramps are hazardous and need increased friction
, to negotiate safely. The only test listed pertaining specifically to tile
flooring is "B".
P4 Product and Material Coordination
In which of the following applications is a Class C wall finish allowed by
code?
A.
An exit stairway enclosure
B.
A theater
C.
A hotel room
D.
A hospital room - ✔✔✔ Correct Answer > The correct answer is C. A
hotel room will not have a high occupancy load (like exit ways or
theaters) or incapacitated occupants (like a hospital room) and a hotel
room is not part of the means of egress; therefore lower class of
finishes is permitted.
P4 Product and Material Coordination