• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

CEPSCI PRACTICE TEST / 111 Questions with Certified Solutions.

Document preview thumbnail
Preview 3 out of 16 pages

CEPSCI PRACTICE TEST / 111 Questions with Certified Solutions. 1972 clean water act - Answer: Administered by the US environmental protection agency (EPA) Created the NPDES 1987 - Answer: Amendment to CWA CALLED WATER QUALITY ACT NPDES in South Carolina - Answer: South Carolina is NPDES delegated state. NPDES regulations are administered by - Answer: SCDHEC Erosion prevention BMPs - Answer: -final stabilization -Riprap for channel stabilization -outlet protection -Dust control -Polyacrylamide (PAM) Surface roughening DESCRIPTION - Answer: horizontal depressions, steps or grooves that run parallel to contour of land surface roughening methods - Answer: -tracking -stair-step grading -grooving

Content preview

CEPSCI PRACTICE TEST / 111 Questions with
Certified Solutions.
1972 clean water act - Answer: Administered by the US environmental protection agency (EPA)
Created the NPDES


1987 - Answer: Amendment to CWA CALLED WATER QUALITY ACT


NPDES in South Carolina - Answer: South Carolina is NPDES delegated state.


NPDES regulations are administered by - Answer: SCDHEC




Erosion prevention BMPs - Answer: -final stabilization
-Riprap for channel stabilization
-outlet protection


Page 1 of 16

,-Dust control
-Polyacrylamide (PAM)


Surface roughening DESCRIPTION - Answer: horizontal depressions, steps or grooves that run
parallel to contour of land


surface roughening methods - Answer: -tracking
-stair-step grading
-grooving


Tracking Installation - Answer: should be performed ASAP after vegetation is removed after
grading activities have ceased. Moving equipment up and down slope.


Surface roughening inspection/maintenance - Answer: after specified intervals and rainfall
events
- if rills appear, they should be re graded and re seeded immediately.


Temporary stabilizaton DESCRIPTION - Answer: reduce erosion and sedimentation by stabilizing
disturbed areas that would otherwise lay bare for long periods of time before they are worked
or stabilized.
- where permanent vegetation growth is not necessary or appropriate.


Temporary stabilization INSTALLATION - Answer: any disturbed areas that will not be worked for
14 days or more.
-seeded areas should be covered with mulch to provided protection from weather.
-water application rates should be controlled to prevent runoff.


SCDOT sedding specs - Answer: terrific resource for vegetated ground cover and associated
mulches SC-M-810-2(04-11)


Page 2 of 16

, -removes guess work
-provides essential info on -seed type
- scheduling
- suitable location


seeding - Answer: select a minimum of 2 perennial seed types for all permanent cover
applications


seed selection is based on - Answer: -specific application
-time of year
-availability of seed


mulching DESCRIPTION - Answer: temp practice where materials such as grass, hay, wood chips,
straw or compost are placed on exposed or recently planted soil surfaces.


Mulching general install - Answer: loose hay or straw should be anchored by applying tackifier
or stapling netting over top.


Mulching materials that dont need anchoring - Answer: heavy enough to stay in place (bark or
wood chips) applied on flat slopes


Wood chip inspection - Answer: wood chips applied to bare ground should be spread to 2 inch
minimum depth.


wood chips used in conjunction with seeding oil should be - Answer: disked into soil


Erosion control blankets DESCRIPTION - Answer: (ECBs) temporary BMPs that hold seed and soil
in place, degrading over time period of 1-3 years.




Page 3 of 16

Document information

Uploaded on
December 20, 2024
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$20.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyresource1
4.6
(709)
Sold
7253
Followers
24
Items
1365
Last sold
1 day ago

Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions