• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

Naslca Virginia Exam Practice 100% Correct!!

Document preview thumbnail
Preview 2 out of 13 pages

Naslca Virginia Exam Practice 100% Correct!!Naslca Virginia Exam Practice 100% Correct!!Naslca Virginia Exam Practice 100% Correct!!Naslca Virginia Exam Practice 100% Correct!!Naslca Virginia Exam Practice 100% Correct!!

Content preview

Naslca Virginia Exam Practice 100%
Correct!!
What is the MAXIMUM penalty for a contractor who undertakes work without the
proper class of license? - ANSWER$500 fine per day for each day of violation plus
penalties for a misdemeanor.

All Class A contractor licensure applications MUST include - ANSWERinformation on
the knowledge, skills, and abilities of the applicant.

What is the PRIMARY purpose of licensing? - ANSWERProtect the health and
welfare of the public.

When a claimant is paid funds from the Contractors Recovery Trust Fund -
ANSWERthe contractor's license is revoked. !!!

The application for licensure MUST include - ANSWERthe business address of the
proposed designated employee.

Which of the following is a requirement for a joint venture? - ANSWEREither the joint
venture or each contracting party of the joint venture must be licensed.

All of the following must be licensed EXCEPT - ANSWERa material supplier who
advises a contractor.

How much is the Class A initial license fee? - ANSWER$200

A licensee's name change MUST be reported to the Board within a MAXIMUM of
how many days? - ANSWER30 days

According to the Board Rules and Regulations, a full-time employee is one who
works a MINIMUM of how many hours per week? - ANSWER30 hours.

A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net
worth of - ANSWER$15,000.

According to the Board Rules and Regulations, which of the following could be a
qualified individual? - ANSWERAny full-time employee.

An appeal of the local building official's decision to refuse to grant a modification to
the USBC MUST be made to the local building board within a MAXIMUM of how
many days? - ANSWER90 days.

A building official MUST issue a certificate of occupancy for a building that meets all
the requirements for a certificate within a MAXIMUM of how many working days after
the certificate was requested? - ANSWER5

, Additions to buildings MUST comply with - ANSWERthe current code for new
construction.

When MUST the work be stopped following the issuance of a stop work order? -
ANSWERImmediately

Who is to be in charge of a local building department? - ANSWERBuilding official.

Contractors who are assessed a fee to support the Transaction Recovery Fund
MUST pay this fee within a MINIMUM of how many days from when the assessment
fee notice was mailed? - ANSWER45 days

Contractors will be assessed a fee for the Transaction Recovery Fund whenever the
fund balance is less than - ANSWER$400,000.

Payments made by the Transaction Recovery Fund to claimants may include an
amount for - ANSWERattorneys' fees.

A contract for which of the following types of structures may be subject to recovery
from the Transaction Recovery Fund? - ANSWERResidential only.

A verified claim for payment from the Transaction Recovery Fund MUST occur within
a MAXIMUM of what period of time from the date the claimant was awarded a final
judgment? - ANSWER12 months.

An appeal of a final decision of a county on an erosion control plan MUST be filed
within a MAXIMUM of how many days? - ANSWER30 days.

Temporary erosion and sediment control measures MUST be removed within a
MAXIMUM of how many days after the final site stabilization? - ANSWER30 days.

Which of the following statements about a sole proprietorship is TRUE? -
ANSWERThe business, or any part of it, can be sold, altered, or exchanged at will.

What type of business organization allows people to share financial resources? -
ANSWERPartnership.

Which of the following estimating methods is typically used by the architect rather
than the contractor? - ANSWERConceptual estimate.

Equipment needs for a project are BEST estimated by - ANSWERcalculating the
number of hours or days it is needed.

What should be added to wage rates to ensure accuracy in estimating labor for a
project? - ANSWERLabor burden.

A reason for using a lower than usual profit markup for a specific project could be to -
ANSWERcover company overhead costs.

Document information

Uploaded on
December 18, 2024
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$25.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DrREED
4.9
(753)
Sold
158
Followers
25
Items
2361
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions