Questions and Answers 100% Solved
Secondary containment required for all new USTs (date) - ✔✔January 1,
1984
(25291; H&SC)
23 CCR closure requirements do not apply to UST closed prior to
____________________ (date) - ✔✔January 1, 1984
(2670(I); CCR)
New UST with pressured piping must have secondary containment after
__________________(date) - ✔✔July 1, 1987
(25291; H&SC)
Spill Containment required for all USTs (date) - ✔✔December 22, 1998
(2665; CCR)
1
©JOSHCLAY 2024/2025. YEAR PUBLISHED 2024.
,Overfill protection required for all USTs (date) - ✔✔December 22, 1998
(2665; CCR)
Secondary Containment required for all non-motor vehicle fuel USTs (date)
- ✔✔December 22, 1998
(2662 (b); CCR)
Striker Plates required (date) - ✔✔December 22, 1998
(2662; CCR)
Single wall steel USTs required cathodic protection & lining or bladder
(date) - ✔✔December 22, 1998
(2662 (c); CCR)
Shut down and fail safe LLDs required for single wall pressurized piping
(date) - ✔✔December 22, 1998
(2666 (c); CCR)
2
©JOSHCLAY 2024/2025. YEAR PUBLISHED 2024.
, Under Dispenser Containment (UDC) required for newly installed USTs
(date) - ✔✔January 1, 2000
(2636 (g); CCR)
An individual installing UST components manufacturer's refresher training
required (date) - ✔✔July 1, 2001
(2715 (g)(1); CCR)
Manufacturer's refresher training required for UST installers after (date) -
✔✔July 1, 2001
(2715 (h); CCR)
Under Dispenser Containment (UDC) required for all USTs (date) -
✔✔December 31, 2003
(2636 (g)(C); CCR)
Secondary Containment Testing for USTs installed prior to 1/1/2001 (date)
- ✔✔January 1, 2003
3
©JOSHCLAY 2024/2025. YEAR PUBLISHED 2024.