• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM NEWEST 2024 WITH COMPLETE QUESTIONS AND CORRECT VERIFIED ANSWERS (DETAILED ANSWERS) ALREADY GRADED A+ 100% GUARANTEED TO PASS CONCEPTS!!!

Document preview thumbnail
Preview 2 out of 9 pages

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM NEWEST 2024 WITH COMPLETE QUESTIONS AND CORRECT VERIFIED ANSWERS (DETAILED ANSWERS) ALREADY GRADED A+ 100% GUARANTEED TO PASS CONCEPTS!!!

Content preview

NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM
NEWEST 2024 WITH COMPLETE QUESTIONS AND
CORRECT VERIFIED ANSWERS (DETAILED ANSWERS)
ALREADY GRADED A+ 100% GUARANTEED TO PASS
CONCEPTS!!!


Acceptance - (answers)The written acceptance by the Department of the Work.



acceptance testing - (answers)Testing conducted by the Department to measure the degree of
compliance to the Contract



actual cost - (answers)The computed cost using calculations provided



addendum - (answers)A Contract revision or response to a Contractor inquiry issued after
advertisement and before the opening of bids.



as-built quantity - (answers)The quantity of a completed Item eligible for payment



authorized funding amount - (answers)The amount of funds authorized by the Department for
the Contract



Bidder - (answers)The individual, firm, partnership, corporation, joint venture, or any acceptable
combination thereof that submits a bid to the Department.



bridge - (answers). A structure, other than a culvert, including supports, erected over a
depression or an obstruction, such as water, highway, or railway, and having a track or
passageway for carrying traffic or other moving loads and having a length 3 measured along the

, center of the structure of more than 20 feet between undercopings of abutments or extreme ends
of openings for multiple boxes. Structure dimensions are defined as follows:



bridge length - (answers)The overall length measured along the line of survey stationing from
back to back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but,
in no case less than the total clear opening of the structure




bridge width - (answers)The clear width measured at right angles to the longitudinal centerline
of the bridge between the bottom of curbs, or in the case of multiple height of curbs, between the
bottoms of the lower risers or, if curbs are not used, between inner faces of parapet or railing



Change Order. - (answers)A written order issued by the Department to the Contractor after
execution of the Contract authorizing one or more of the following: 1. Changes in the Work. 2.
Modifications in the basis of payment. 3. Modifications to Contract Time.



Commercially Useful Function - (answers)Occurrences in which the subcontractor is
responsible for the execution of a distinct element of the work of a contract and carrying out its
responsibilities by actually performing, managing, and supervising the work involved, and with
respect to materials and supplies used on the contract, prepares the estimate, negotiates price,
determines quality and quantity, orders the material, arranges delivery, installs (where
applicable), and pays for the material and supplies itself for the project.



Completion - (answers)When all of the following have occurred: 1. The Work has been
satisfactorily completed in all respects according to the Contract. 2. The Project is ready for use
by the Department as required by the Contract. 3. The Contractor has satisfactorily executed and
delivered to the RE all documents, certificates, and proofs of compliance required by the
Contract including the Notice of Completion.



construction operations - (answers)Physical work done in the performance of the Contract
within the Project Limits. Does not include off-site mobilization, procurement and off-site
storage of materials and plants, engineering, performance bond and payment bond, surveys,
working drawings, off-site field offices, schedules, certificates, forms, or documents

Document information

Uploaded on
December 15, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$23.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyplug
3.3
(38)
Sold
4049
Followers
16
Items
1240
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions