S to N - (answers)Downstation
W to E - (answers)Downstation
Stationing - (answers)Starts at 0+00
Stationing Measurement - (answers)1+00 is 100 feet
Straight Edge is the - (answers)Measurement of Pavement smoothness with a 15 foot 4.573 m
rolling straightedge
Straight Edge is used to - (answers)identify problems
Random sampling - (answers)Are random numbers generated usually by a VT for cores to be
extracted from the roadway
How often should you calibrate a Straight edge - (answers)Calibrate at the start of each working
period
Using the manual straight edge you find what kind of spot to place the rolling straightedge? -
(answers)Locate a flat area with the manual straightedge and place the rolling straightedge next
to the manual straightedge and the gauge should read 0
, The 3/16 and the 3/8 shims go under which wheels during calibration - (answers)The outside
wheels to measure the low and the center to measure the high. Gauge should read 3/16 on the
3/16 shim and vice versa for the 3/8 shims. Make sure the center wheel moves up and down
freely.
Calibration materials for Straightedge - (answers)Rolling Straightedge
Manual Straightedge
Manual Measurement (ruler)
x4 3/16 shims 5mm thick
x4 3/8 shims 10mm thick
When to perform final straightedge - (answers)After an entire lane has been paved
When to perform final straightedge - (answers)Pavement should be an ambient temperature
You cannot use the straightedge until it has been properly - (answers)calibrated
When performing the straightedge procedure - (answers)Maintain proper traffic management
and safety
Cross slopes can be either done - (answers)Manually or with a smart level
When using a manual cross slope you first - (answers)Place a simple level on pavement
After placing the simple level on the pavement then you - (answers)Raise the down end of the
level until it is level (bubble center)
ACTUAL QUESTIONS AND CORRECT VERIFIED
ANSWERS ALREADY GRADED A+ 100%
GUARANTEED PASS!
S to N - (answers)Downstation
W to E - (answers)Downstation
Stationing - (answers)Starts at 0+00
Stationing Measurement - (answers)1+00 is 100 feet
Straight Edge is the - (answers)Measurement of Pavement smoothness with a 15 foot 4.573 m
rolling straightedge
Straight Edge is used to - (answers)identify problems
Random sampling - (answers)Are random numbers generated usually by a VT for cores to be
extracted from the roadway
How often should you calibrate a Straight edge - (answers)Calibrate at the start of each working
period
Using the manual straight edge you find what kind of spot to place the rolling straightedge? -
(answers)Locate a flat area with the manual straightedge and place the rolling straightedge next
to the manual straightedge and the gauge should read 0
, The 3/16 and the 3/8 shims go under which wheels during calibration - (answers)The outside
wheels to measure the low and the center to measure the high. Gauge should read 3/16 on the
3/16 shim and vice versa for the 3/8 shims. Make sure the center wheel moves up and down
freely.
Calibration materials for Straightedge - (answers)Rolling Straightedge
Manual Straightedge
Manual Measurement (ruler)
x4 3/16 shims 5mm thick
x4 3/8 shims 10mm thick
When to perform final straightedge - (answers)After an entire lane has been paved
When to perform final straightedge - (answers)Pavement should be an ambient temperature
You cannot use the straightedge until it has been properly - (answers)calibrated
When performing the straightedge procedure - (answers)Maintain proper traffic management
and safety
Cross slopes can be either done - (answers)Manually or with a smart level
When using a manual cross slope you first - (answers)Place a simple level on pavement
After placing the simple level on the pavement then you - (answers)Raise the down end of the
level until it is level (bubble center)