100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CM 2116 FINAL comprehensive questions and answer latest upload 2024/ 2025 with 100% verified solutions

Rating
-
Sold
-
Pages
37
Grade
A+
Uploaded on
11-12-2024
Written in
2024/2025

CM 2116 FINAL comprehensive questions and answer latest upload 2024/ 2025 with 100% verified solutions

Institution
CM 2116
Course
CM 2116











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CM 2116
Course
CM 2116

Document information

Uploaded on
December 11, 2024
Number of pages
37
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

CM 2116 FINAL comprehensive questions and
answer latest upload 2024/ 2025 with 100% verified
solutions

What does BOP stand for on piping drawings?
Select one:
a. Bottom of Pipe
b. Base of Pipe
c. Boundary of Pipe - ANSWER-Bottom of Pipe


Which property is the same for all varieties of 2-inch nominal steel pipes?
Select one:
a. Inside Diameter
b. Length
c. Outside Diameter - ANSWER-Outside Diameter


......................... piping drawings are the most important drawings for
installation contractors during the field portion of the project.
Select one:
a. Single Line
b. Isometric
c. Double Line - ANSWER-Isometric


It's popular within the process piping industry because it can be laid out and
drawn with ease and portrays the object in a realistic view
-isometric drawings
-double line drawings
-Single line drawing - ANSWER-isometric drawings

1|Page

,Simplified drawings that only shows equipment and their connections not the
size and details
-isometric drawings
-double line drawings
-Single line drawing - ANSWER-Single line drawing


In these drawings the equipment is represented as if it had been photographed.
-isometric drawings
-double line drawings
-Single line drawing - ANSWER-double line drawings


A Change Order is a written instrument prepared by the contractor and signed
by the Owner.
Select one:
True
False - ANSWER-False


The Architect will review and approve or take other appropriate action upon the
Contractor's submittals such as Shop Drawings.
Select one:
True
False - ANSWER-True


The Contractor is not responsible for errors or omissions in Shop Drawings,
Product Data, Samples or similar submittals by the Architect's approval thereof.
Select one:
True
False - ANSWER-False
2|Page

,Shop drawings are typically a set of drawings or set of drawings required for
prefabricated components.
Select one:
True
False - ANSWER-True


For Change Order, Contractor and Architect state their agreement upon: (select
all that apply)
Select one or more:
a. The amount of the adjustment in the Contract Sum
b. The extent of the adjustment in the Contract Time
c. The change in the Work - ANSWER-a. The amount of the adjustment in the
Contract Sum
b. The extent of the adjustment in the Contract Time
c. The change in the Work


Which information are included in Shop Drawings? (Select all that apply)
Select one or more:
a. Financial statements
b. Components and assemblies
c. Contact Info for Contractor, Fabricator, and Detailer
d. Quality and finish indications - ANSWER-b. Components and assemblies
c. Contact Info for Contractor, Fabricator, and Detailer
d. Quality and finish indications


Who is responsible for:
Mark submittals with appropriate "actions"


3|Page

, Select one:
a. Contractor
b. Architect or design professional - ANSWER-Architect or design professional


Who is responsible for:
"Identify which specified submittals, if any, are missing"
Select one:
a. Architect or design professional
b. Contractor - ANSWER-Architect or design professional


Who is responsible for interpreting and responding Requests For Information
(RFI)?
Select one:
a. Contractor
b. Architect
c. Owner - ANSWER-Architect


Shop Drawings are prepared for the Work by the: (Select all that apply)
Select one or more:
a. Manufacturer
b. Contractor
c. Supplier
d. Subcontractor
e. Owner - ANSWER-a. Manufacturer
b. Contractor
c. Supplier
d. Subcontractor


4|Page
$10.29
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ScienceMan

Get to know the seller

Seller avatar
ScienceMan Harvard University
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
1 year
Number of followers
0
Documents
55
Last sold
-
MAN OF SCIENCE INTERNATIONAL

A man of science should live a little bit of style.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions