• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

IMSA Workzone Traffic Tech Study Guide – Complete With Solutions

Document preview thumbnail
Preview 2 out of 11 pages

IMSA Workzone Traffic Tech Study Guide – Complete With Solutions

Content preview

IMSA Workzone Traffic Tech Study Guide – Complete
With Solutions

What is a long term stationary? Right Ans - Work that occupies a location
more than 3 days

What is intermediate term stationary? Right Ans - 1 daylight period up to 3
days or nightime work lasting more than 1 hour

What is short term stationary? Right Ans - Daytime work that occupies a
location for more than 1 hour within a single daylight period.

What's is short duration operations Right Ans - Work that occupies a
location up to 1 hour

Mobile operations? Right Ans - Work activities that move along the road
either intermittently or continuously?

What's the urban ( low speed) spacing? Right Ans - 100/100/100 ft

What's the urban ( high speed) spacing ? Right Ans - 350/350/350 ft

What is the distance rural spacing ? Right Ans - 500/500/500 ft

What is expressway/ freeway spacing ? Right Ans - 1,000/1,500/2,640 ft

What is type A arrow boards used for ? What's the legibility distance ?
Right Ans - Low speeds locations such as urban streets and 1/2 mile

What is type B arrow boards used for ? What's the legibility distance ?
Right Ans - Intermediate speed facilities or mobile operations on high speeds
roadways and 3/4 miles

What is type A beacons and what are they used for?
What is the visibility? Where can it be mounted Right Ans - Flashing low
intensity warning lights
During nightime hours
They warn motorist from potential hazard

, Mounted on channelizing devices
Visible on clear night from 3,000 ft

What is type B beacons and what are they used for?
What is the visibility? Where can it be mounted Right Ans - High intensity
warning lights
Both day and night
Design to operate 24 hours
Mounted on advanced warning signs
Visible on sunny day, 1,000 ft

What is type C arrow boards used for ? What's the legibility distance ?
Right Ans - High speed, high volume facilities and one mile distance

What is type D arrow boards used for ? What's the legibility distance ?
Right Ans - Intended to use in authorized vehicles and shall conform to the
shape of the arrow. And 1/2 mile

What's are type 1 barricades used for ? What's the minimum height ? And the
minimum length ? What's the size of the rail ? Right Ans - Used on low
speeds
36 inches in height
24 inches in length
Rail size - 8 to 12 inches

What's are type 2 barricades used for ? What's the minimum height ? And the
minimum length ? What's the size of the rail ? Right Ans - Use for
expressways and freeways
36 inches in height
Minimum length of 24 inches
8 to 12 inches rails

What's are type 3 barricades used for ? What's the minimum height ? And the
minimum length ? What's the size of the rail ? Right Ans - Used to close
roadways
Minimum height of 5 ft
Minimum length of 4 ft

What is type C beacons and what are they used for?

Document information

Uploaded on
December 10, 2024
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LeCrae
4.0
(448)
Sold
2150
Followers
1409
Items
22712
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions