Construction Engineering: Exam 1
questions with complete solutions
graded A+
Used for very large projects when the owner does not choose to have contact with the contractor or
designer - correct answer ✔✔Turnkey
Commonly used for public projects - correct answer ✔✔General Contractor
Fast track construction - correct answer ✔✔Design Build
Construction manager engages the subcontractors - correct answer ✔✔Modified construction
management
Most widely used project delivery system - correct answer ✔✔General contractor
Has the disadvantage of a lack of checks and balances - correct answer ✔✔Design build
Party most responsible for project time, cost, and quality does not have liability for these variables. -
correct answer ✔✔Pure construction management
Owner has an independent professional consultant to manage and monitor the construction - correct
answer ✔✔Pure construction management
Owner has the least monitoring responsibility - correct answer ✔✔Turnkey
The lender of the funds for the project owner prefers this type of contract, the most common - correct
answer ✔✔Lump sum
questions with complete solutions
graded A+
Used for very large projects when the owner does not choose to have contact with the contractor or
designer - correct answer ✔✔Turnkey
Commonly used for public projects - correct answer ✔✔General Contractor
Fast track construction - correct answer ✔✔Design Build
Construction manager engages the subcontractors - correct answer ✔✔Modified construction
management
Most widely used project delivery system - correct answer ✔✔General contractor
Has the disadvantage of a lack of checks and balances - correct answer ✔✔Design build
Party most responsible for project time, cost, and quality does not have liability for these variables. -
correct answer ✔✔Pure construction management
Owner has an independent professional consultant to manage and monitor the construction - correct
answer ✔✔Pure construction management
Owner has the least monitoring responsibility - correct answer ✔✔Turnkey
The lender of the funds for the project owner prefers this type of contract, the most common - correct
answer ✔✔Lump sum