ISA Utility Specialist (Chapters 1-7) In the U.S., enforcement of safety work rules resides with: - CORRECT ANSWER Occupational Safety & Health Administration (OSHA) Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose of __________ __________ __________. - CORRECT ANSWER ensuring reliable service A comprehensive vegetation management program should be __________ rather than reactive, & based on principals of __________ vegetation management. - CORRECT ANSWER proactive; integrated What is a volt? - CORRECT ANSWER a unit of electrical force Major storms or __________ weather events are the usual cause of power outages over large areas. - CORRECT ANSWER catastrophic Without __________, messages can have multiple meanings. - CORRECT ANSWER context ISA BMPs provide a practical guide for implementing __________ __________. - CORRECT ANSWER industry standards Electrical resistance determines how much __________ is required to move electricity along a conductor and is measured in __________. - CORRECT ANSWER energy; ohms When communicating, a person's experience & __________ will influence how the person reacts. - CORRECT ANSWER perceptions Crew mobilization for a storm event is much more rapid from a __________ status. - CORRECT ANSWER standby NERC standards are specific to what line voltages? - CORRECT ANSWER 200 kV & above

Content preview

ISA Utility Specialist (Chapters 1-7)
In the U.S., enforcement of safety work rules resides with: - CORRECT ANSWER
Occupational Safety & Health Administration
(OSHA)

Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose
of __________ __________ __________. - CORRECT ANSWER ensuring
reliable service

A comprehensive vegetation management program should be __________ rather than
reactive, & based on principals of __________ vegetation management. - CORRECT
ANSWER proactive;
integrated

What is a volt? - CORRECT ANSWER a unit of electrical force

Major storms or __________ weather events are the usual cause of power outages
over large areas. - CORRECT ANSWER catastrophic

Without __________, messages can have multiple meanings. - CORRECT
ANSWER context
ISA BMPs provide a practical guide for implementing __________ __________. -
CORRECT ANSWER industry standards
Electrical resistance determines how much __________ is required to move electricity
along a conductor and is measured in __________. - CORRECT ANSWER
energy;
ohms

When communicating, a person's experience & __________ will influence how the
person reacts. - CORRECT ANSWER perceptions

Crew mobilization for a storm event is much more rapid from a __________ status. -
CORRECT ANSWER standby

NERC standards are specific to what line voltages? - CORRECT ANSWER 200
kV & above

,An important first step in any vegetation management program should be to asses
system conditions, which is often done through an __________. - CORRECT
ANSWER inventory

Which type of cuts are less unacceptable? - CORRECT ANSWER internodal cuts
(e.g. topping)

A worker neglecting to wear cut-resistant chaps while operating a chainsaw is
committing an unsafe __________, while an employer failing to provide chaps is
creating an unsafe __________. - CORRECT ANSWER act;
condition

A conductor carrying more than __________ volts would be considered a NERC line. -
CORRECT ANSWER 200,000
Communication is both verbal & nonverbal. When a customer is confronted with
contradictory information, the person will usually believe the __________ message. -
CORRECT ANSWER nonverbal
Voluntary safety standards for pruning, trimming, repairing, maintaining & removing
trees, & cutting brush: - CORRECT ANSWER ANSI Z133

NERC standards require the reporting of all tree caused outages by __________
categories - CORRECT ANSWER three

A traditional cycle will schedule maintenance __________ trees grow into conductors. -
CORRECT ANSWER before

Which type of cuts are more acceptable? - CORRECT ANSWER nodal cuts
(e.g. drop-crotch, thinning)

The __________-__________ rule suggests that workers should take time before
starting a job to check for potentially unsafe conditions & discuss them. - CORRECT
ANSWER two-minute

According to ANSI Z133, the minimum approach distance for persons other than
qualified line-clearance arborists for 50 kV & less is __________. - CORRECT
ANSWER 10 feet

Trees growing into contact with a single-phase distribution conductor pose __________
threat of a tree-ground fault. - CORRECT ANSWER little

Where should the final cut be made for proper utility pruning? - CORRECT
ANSWER just outside of the branch bark ridge and the branch collar

,A vegetation management scheduling unit may be an entire __________ or a
__________ __________. - CORRECT ANSWER circuit;
geographical area

2 examples of protective equipment: - CORRECT ANSWER circuit breakers
lightning receptors

On a storm site, cutting should not begin until all risks have been assessed & the
__________ approach has been decided & adopted. - CORRECT ANSWER
safest

Actively __________ can facilitate understanding a customer's perceptions and
demonstrate the utility representative's sincere interest in a customer. - CORRECT
ANSWER listening
As clearance work progresses, __________ between crews & dispatcher is critically
important to determine locations of downed or damaged lines. - CORRECT
ANSWER communication

__________ negotiation uses the best aspects from both hard & soft bargaining. -
CORRECT ANSWER interest-based

An energized wire or conductor in a circuit is also known as a __________. -
CORRECT ANSWER phase
Fast-growing, problem species are sometimes known as __________ __________. -
CORRECT ANSWER cycle busters

Flush cuts damage which tissues? - CORRECT ANSWER the trunk

Clearing for a new distribution line is likely to be paid for by a __________ budget. -
CORRECT ANSWER capital

Surface temperatures at the point of contact with high voltage can reach __________
degrees F. - CORRECT ANSWER 1,000

__________ __________ occurs when someone touches an energized fixture.
__________ __________ can occur when a person touches a conductive object that is
in contact with an energized fixture. - CORRECT ANSWER direct contact;
indirect contact

A grid-based scheduling system is most likely to be used by highly __________ utilities.
- CORRECT ANSWER urbanized

, Why is utility pruning done? - CORRECT ANSWER to maintain safety and rights-
of-way

Reactive maintenance is often called __________. - CORRECT ANSWER
hotspotting

True or False?
Guy wires are intended to help support poles but may become unintentionally
energized. - CORRECT ANSWER true

One of the highest personal risks in a storm is __________. - CORRECT ANSWER
fatigue

When trying to negotiate mutually agreeable solutions & gain commitment based on
customer interests, the focus should be on __________, no on specific individuals. -
CORRECT ANSWER issues
A __________ is similar to a fuse or cutout, but it resets after a predetermined time
period. - CORRECT ANSWER re-closer

Always consider that all lines are __________. - CORRECT ANSWER energized

Tree replacement programs are an important aspect of many utility customer relations
programs & focus on selecting: - CORRECT ANSWER the right tree for the right
place

If a structurally weak tree were on or close to the utility right-of-way, __________
__________ & __________ would be considered targets. - CORRECT ANSWER
utility lines & equipment

A challenge with grid-based scheduling is that circuits may traverse many grids,
allowing for a variety of __________ __________. - CORRECT ANSWER tree
conditions

The difference in voltage between two objects someone simultaneously touches: -
CORRECT ANSWER touch potential

Which type of pruning encourages the growth of branches away from the wires? -
CORRECT ANSWER directional pruning

Minimum working distances for qualified line-clearance arborists are specified in the
__________ safety standard. - CORRECT ANSWER ANSI Z133

Document information

Uploaded on
December 6, 2024
Number of pages
37
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$25.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CornelWest
3.7
(267)
Sold
1661
Followers
1131
Items
13726
Last sold
5 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions