100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

3rd class stationary steam engineer license prep

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
04-12-2024
Written in
2024/2025

3rd class stationary steam engineer license prep

Institution
3rd Class Stationary Steam Engineer License Prep
Course
3rd class stationary steam engineer license prep









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
3rd class stationary steam engineer license prep
Course
3rd class stationary steam engineer license prep

Document information

Uploaded on
December 4, 2024
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

3rd class stationary steam engineer
license prep Questions And Answers
_________ are necessary for complete combustion - -time, temperature,
mixture, and atomization

-if the steam pressure gauge indicates 200 PSIG, the absolute pressure
is______ - -214.7

-a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and
closes at 398 PSI. The blowdown is______psi - -12

-an oil cooler is commonly used with a(n) ________ when operating in
conjunction with a turbo-generator - -steam turbine

-a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a
steam temperature of 500 degrees Fahrenheit. The steam produced is
_______ steam - -superheated

-the economizer on a boiler is used to _______ - -add heat to the feed water

-blowers are normally used with________ boilers - -water tube

-overheating of tubes on a boiler can be caused by________ - -scale on tubes

-carbon dioxide in a condensate return system causes_________ - -channeling

-a ________ pump is a positive displacement pump - -reciprocating

-a boiler generating 6000 lb of steam/hr produces _______btu/hr - -6,000,000

-a bottom blowdown is performed on a boiler to _____ - -discharge sludge and
sediment

-water columns are connected to the boiler with a minimum of _______" pipe -
-1

-the minimum size of a water column blowdown valve is_______". - -3/4

-the maximum size bottom blowdown valve on a boiler is_________". - -2 1/2

-a ________ allows condensate to pass through, but stops Steam. - -a steam
trap

, -when taking over a shift, the first thing to do is check the________ - -water
level in each boiler

-according to the asme code, a high-pressure boiler having more than 500
square feet of heating surface shall have________ - -two or more safety valves

-the probable cause of an increase in temperature of gases of combustion at
the boiler Outlet is____ - -dirty heating services

-boilers in battery equipped with________ must have two main steam stop
valves and a free-flowing drain between them - -manhole openings

-in order to be sure the gauge glass is indicating an accurate water level
reading, the stationary engineer should______ - -blowdown the gauge glass

-a continuous blowdown line is located___ - -in the Steam and water drum
well below the nowl

-a temperature reading of 80 degrees Celsius is equal to_________°f - -176

-a chimney temperature of 250 degrees Fahrenheit above steam
temperature indicates_______ - -poor efficiency

-a manometer is red in________ - -inches of water

-the boiling point of water will____ with an increase in pressure - -be raised

-if a lather is not obtained when performing a soap hardness test, the water
sample is_______ - -hard

-combustion efficiency can be increased when air is________ - -preheated

-______ draft is produced by a fan located between the boiler and the
chimney - -induced

-the overspeed trip on a steam turbine should be tested ______ - -before
putting the steam turbine on-line

-a high CO2 reading in the gases of combustion is a sign of____ - -High
combustion efficiency

-the purpose of chemically treating feedwater is to________ - -turn scale-
forming salts to a non adhering sludge
$12.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
juddykingori

Get to know the seller

Seller avatar
juddykingori EXAMS
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
1 year
Number of followers
0
Documents
33
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions