Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

HEAD FIRST PMP EXAM |QUESTIONS & ANSWERS VERIFIED SOLUTIONS 100%|GRADE A+|LATEST 2024/2025

Document preview thumbnail
Preview 2 out of 9 pages

HEAD FIRST PMP EXAM |QUESTIONS & ANSWERS VERIFIED SOLUTIONS 100%|GRADE A+|LATEST 2024/2025 151. There have been several rounds of layoffs at your company. Now your project team is worried about their job security, and you've noticed that their performance has decreased significantly because of it. This is predicted by which motivational theory? A. McGregor's Theory of X and Y B. Maslow's Hierarchy of Needs C. McClelland's Achievement Theory D. Herzberg's Motivation-Hygiene Theory - 151. Answer: B

Content preview

HEAD FIRST PMP EXAM |QUESTIONS & ANSWERS
VERIFIED SOLUTIONS 100%|GRADE A+|LATEST 2024/2025

151. There have been several rounds of layoffs at your company. Now your project
team is worried about their job security, and you've noticed that their performance
has decreased significantly because of it. This is predicted by which motivational
theory?

A. McGregor's Theory of X and Y
B. Maslow's Hierarchy of Needs
C. McClelland's Achievement Theory
D. Herzberg's Motivation-Hygiene Theory - ✔✔151. Answer: B
Maslow's Hierarchy of Needs says that people have needs, and until the lower ones
(like acceptance on the team, job safety or job security) are satisfied, they won't
even begin to think about the higher ones (fulfilling their potential and making a
contribution).

152. Which of the following is NOT included in a cost of quality calculation?
A. Team members' time spent finding and repairing defects
B. Quality managers' time spent writing quality standards
C. Project managers' time spent creating the project management plan
D. Team members' time spent reviewing specifications, plans, and other documents
- ✔✔152. Answer: C
Cost of quality is what you get when you add up the cost of all of the prevention
and inspection activities you are going to do on your project. It doesn't just include
the testing. It includes any time spent writing standards, reviewing documents,
meeting to analyze the root causes of defects, reworking to fix the defects once
they're found by the team—absolutely everything you do to ensure quality on the
project.

153. Which of the following contracts has the MOST risk for the seller?
A. Cost plus fixed fee (CPFF)
B. Time and Materials (T&M)
C. Cost plus percentage of costs (CPPC)
D. Fixed price (FP) - ✔✔153. Answer: D
A fixed price (FP) contract means that the buyer pays one amount regardless of
how much it costs the seller to do the work. A fixed price contract only makes
sense in cases where the scope is very well known. If there are any changes to the
amount of work to be done, the seller doesn't get paid any more to do it.

, 154. You are managing an industrial design project for an important client. Two of
your team members have a disagreement on project priorities. One person wants to
do certain activities first, while the other feels they should be left until the end of
the project. You work with both people to forge a compromise where those
activities are neither first nor last, but instead done in the middle of the project.
Nobody is particularly unhappy with this solution. Another name for a compromise
is a:
A. Win-win solution
B. Win-lose solution
C. Lose-lose solution
D. Standoff solution - ✔✔154. Answer: C
A lot of people think compromise is a great way to handle conflicts. But any time
there's a compromise, it means that everyone needs to give up something. That's
why compromise is often called a lose-lose solution. It's always better to confront
the problem and fix the root cause of the conflict. You should only force people to
compromise if that's the only option.

155. A project manager on a construction project includes a line item in the budget
for insurance for the equipment and job site. This is an example of:
A. Transference
B. Mitigation
C. Avoidance
D. Acceptance - ✔✔155. Answer: A
One effective way to deal with a risk is to pay someone else to accept it for you.
This is called transference. The most common way to do this is to buy insurance.

156. You are talking to experts and gathering independent estimates for your
contract. Which of the following BEST describes what you are doing?
A. Plan Procurements
B. Conduct Procurements
C. Administer Procurements
D. Close Procurements - ✔✔156. Answer: B
When you're working with procurements, Independent Estimates is one of the tools
and techniques of the Conduct Procurements process. It certainly sounds a lot like
something you'd do while planning out your procurements. Don't forget that the
Conduct Procurements process involves finding sellers as well as carrying out the
work to complete the contract. That's why you use things like Bidder Conferences
and Qualified Seller Lists in Conduct Procurements.

Document information

Uploaded on
December 4, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$9.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
263
Last sold
-


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions