• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

CDC 3E351 D Volume 3 Exam Questions And Correct Answers 100% Pass

Document preview thumbnail
Preview 2 out of 10 pages

CDC 3E351 D Volume 3 Exam Questions And Correct Answers 100% Pass What is the first step you should do in locating corner stakes for a building? - AnswersEstablish a baseline. Once the building corners are square, which step is taken next when you are preparing a site for concrete? - AnswersErect the batter boards and place the building lines. You must install bracing on batter boards if the soil is - AnswersLoose or the stakes are higher than 3 feet. How do you hold the building lines securely in place in batter board construction? - AnswersMake a saw kerf in the outside edge of each ledger board. When excavating around the outside wall planes, how much working space should you allow for form construction? - Answers2 feet. When grade stakes are used between wooden footing forms, which action must you take before the concrete sets? - AnswersRemove the stakes and fill holes with concrete. ©BRAINBARTER EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e How do you form any square or rectangular dimensioned slab using metal forms? - AnswersBy letting one form end extend past each corner. When constructing a footing for a bearing wall, the sides are held in place with the correct distance maintained between them through the use of - AnswersStakes and spreaders. When using 1-inch lumber for slab forms, at what approximate distance should you drive stakes along the board? - Answers2 feet. When using 2-inch lumber for slab forms, at what approximate distance should you drive stakes along the board? - Answers4 feet. How do you reinforce studs that extend over four or five feet when constructing wall forms? - AnswersRun double wales horizontally. When constructing a new ramp, you must ensure the ramp's width is not - AnswersLess than 36 inches. When reinforcing steel specs require a No. 5 rebar, what is the actual need? - Answers5/8 inch. When splicing welded wire fabric, a normal splice is made by lapping - AnswersOne full square plus two inches. When constructing footings and other structural members that are against the ground, how much space should you allow between the steel and ground? - Answers3 inches.

Content preview

©BRAINBARTER EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.




CDC 3E351 D Volume 3 Exam Questions
And Correct Answers 100% Pass


What is the first step you should do in locating corner stakes for a building? -

Answers✔Establish a baseline.


Once the building corners are square, which step is taken next when you are preparing a site

for concrete? - Answers✔Erect the batter boards and place the building lines.


You must install bracing on batter boards if the soil is - Answers✔Loose or the stakes are higher

than 3 feet.


How do you hold the building lines securely in place in batter board construction? -

Answers✔Make a saw kerf in the outside edge of each ledger board.


When excavating around the outside wall planes, how much working space should you allow

for form construction? - Answers✔2 feet.


When grade stakes are used between wooden footing forms, which action must you take

before the concrete sets? - Answers✔Remove the stakes and fill holes with concrete.




1|Page

, ©BRAINBARTER EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
How do you form any square or rectangular dimensioned slab using metal forms? -

Answers✔By letting one form end extend past each corner.


When constructing a footing for a bearing wall, the sides are held in place with the correct

distance maintained between them through the use of - Answers✔Stakes and spreaders.


When using 1-inch lumber for slab forms, at what approximate distance should you drive stakes

along the board? - Answers✔2 feet.


When using 2-inch lumber for slab forms, at what approximate distance should you drive stakes

along the board? - Answers✔4 feet.


How do you reinforce studs that extend over four or five feet when constructing wall forms? -

Answers✔Run double wales horizontally.


When constructing a new ramp, you must ensure the ramp's width is not - Answers✔Less than

36 inches.


When reinforcing steel specs require a No. 5 rebar, what is the actual need? - Answers✔5/8

inch.


When splicing welded wire fabric, a normal splice is made by lapping - Answers✔One full

square plus two inches.


When constructing footings and other structural members that are against the ground, how

much space should you allow between the steel and ground? - Answers✔3 inches.



2|Page

Document information

Uploaded on
December 2, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainbarter
3.6
(58)
Sold
367
Followers
159
Items
22996
Last sold
3 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions