CM 4211 Final Exam Study Questions Solved 100% Correct | Verified Solutions

Document preview thumbnail
Preview 3 out of 29 pages

CM 4211 Final Exam Study Questions Solved 100% Correct | Verified Solutions

Content preview

CM 4211 Final Exam Study Questions Solved
100% Correct | Verified Solutions
T - ✔✔If work is delayed by the owner, but the contractor still completes the work within
the contract time limits, the contractor may be entitled to a cost adjustment



T - ✔✔The two main reason of giving notice to the owner of a delay is to start the delay
time period and to give the owner time the opportunity to do something about the delay, if
possible



T - ✔✔Constructive notice is when the owner is charged with knowledge of a delay
even though the construction contractor does not give actual notice of the delay



T - ✔✔Liquidated damages are an agreed upon amount per day for each day that
the contract is finished after the adjusted completion date



T - ✔✔Liquidated damages are not a penalty



T - ✔✔Force majeure means a condition beyond the control of a party



T - ✔✔To support a claim for a time extension, a construction contractor must support
the claim by showing the delay was beyond its control and that it consumed time affecting
completion of the project



T - ✔✔Acceleration is the completion of contract work at a more rapid pace than required
by the contract

,T - ✔✔Constructive acceleration is the forced completion of contract work in a shorter
period than should have been allowed by the issuance of a properly supported contract
time extension



T - ✔✔The failure of the owner to timely grant a time extension may result in
constructive acceleration



T - ✔✔Course of dealing is determined by how the owner and the construction
contractor performed on prior contracts



T - ✔✔Customs and trade practices are not considered when determining the clarity of
the express contract terms



T - ✔✔Reading the contract "as a whole" means that an interpretation must be
considered in context



T - ✔✔To prove course of dealing necessarily requires parole evidence



T - ✔✔The doctrine of contra proferentem is only considered a last resort



T - ✔✔The doctrine of contra proferentem states the contract will be construed against
the drafter of the document when all other manifestations do not resolve the problem



T - ✔✔Documentation is another name for well kept job records



T - ✔✔The cardinal rule of good contract administration is to put it in writing



T - ✔✔Documentation is best when it is kept daily

, T - ✔✔"He said she said" is an example of hearsay



T - ✔✔The writer of the documentation must have been present when the events in the
documentation were recorded and/or in a position to have accurate knowledge of the events
in order for the documentation to be introduced into evidence



T - ✔✔In order to introduce documentation into evidence it cannot have been prepared
for the specific purpose of use in litigation



T - ✔✔All documentation should answer the questions "when" and "what"



T - ✔✔A letter of transmittal does not require a response



T - ✔✔In a letter of notice, a position is taken as well as a basis for believing the position
is correct



T - ✔✔The job diary is a routine job record



T - ✔✔Risk can only be mitigated, not eliminated



T - ✔✔In order for a claim to be valid, it must be proven that the claimant is entitled to
an adjustment and the amount of the adjustment



T - ✔✔The most important provision regarding claims is the notice requirements



T - ✔✔If an owner does not timely respond to a contractor's claim, then he will be
deemed to have denied the claim

Document information

Uploaded on
November 26, 2024
Number of pages
29
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
114
Followers
5
Items
24387
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions