• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 25 pages
Exam (elaborations)

CM 4211 need to Study Questions Solved 100% Correct | Verified Solutions

Document preview thumbnail
Preview 3 out of 25 pages

CM 4211 need to Study Questions Solved 100% Correct | Verified Solutions

Content preview

CM 4211 need to Study Questions Solved
100% Correct | Verified Solutions

Which of the following statements is true?
Select one:
a. In a cost-plus-incentive-fee (CPIF) contract the contractor can lose money.

b. In a guaranteed-maximum-price (GMP) contract the contractor can never
lose money.
c. A fixed price contract holds more risk for the owner than a cost-plus contract.

d. A schedule-of-items contract is a type of cost-plus-incentive-fee contract. - ✔✔In a
cost-plus-incentive-fee (CPIF) contract the contractor can lose money.


Which of the following statements is true?
Select one:

a. Standard form contracts are used because they contain provisions deemed to be
fair to the parties.

b. The four most important things that should be in an advertisement (for a
construction project) are (1) project identification, (2) contractor identification,

(3) time and place for the bid opening, and (4) instructions how to get the
bid documents.
c. The completed "bid form" is the contract in a construction project.
d. In an AIA standard form contract, if there is any bias it is in favor of the

contractor. - ✔✔Standard form contracts are used because they contain provisions
deemed to be
fair to the parties.

,Which of the following statements is true?
Select one:

a. Whether a project will require union labor or not is something that will be
found in the general conditions.

b. Bid forms may require information about the contractor's work history and
financial strength.
c. The bid form itself is drafted and completed by the contractor
d. Instructions to Bidders is where prospective bidders find out how to get to the

owner's office to pick up the bid documents. - ✔✔Bid forms may require information
about the contractor's work history and
financial strength.


Which of the following statements is true?
Select one:
a. The five threshold red flag construction contract clauses are (1) dispute resolution,

(2) changes, (3) differing site conditions, (4) payments and progress payments,
and (5) terminations and partial terminations.

b. The contractor does not need to inspect the site prior to submitting a bid
unless the bid documents expressly require such an inspection.

c. The changes clause usually gives the owner the unilateral right to make
changes to the contract.

d. Supplementary conditions supplement the general conditions and usually remain
the same from contract to contract - ✔✔



Which of the following statements is true?
Select one:
a. . If the contract contains a "no-damages-for-delay" clause, the contractor will not

, be entitled to either a time adjustment nor a cost adjustment in the contract caused by a delay.

b. Contractors prefer a contract to have a narrow list of excusable delays.

c. In the dispute resolution clause of a private project contract, it is important to know
whether or not sovereign immunity has been waived.

d. If a contract has no differing site conditions clause, then the contractor is responsible for the
costs if conditions are encountered that are more costly to

overcome. - ✔✔If a contract has no differing site conditions clause, then the contractor
is responsible for the costs if conditions are encountered that are more costly to
overcome.


Which of the following statements is true?
Select one:
a. "Liquidated damages" are assessed based on the actual damages suffered by the
owner.
b. The time provisions in a construction contract are usually measured in work days.
c. The owner usually has the unilateral right to terminate a construction contract.
d. A contractor cannot be assessed damages for missing milestone completion dates

provided that he completes the entire contract timely. - ✔✔The owner usually has
the unilateral right to terminate a construction contract.


Which of the following statements is NOT true?
Select one:
a. There is no implied obligation for the owner to provide access to the construction
site
b. A default termination by the owner may be justified if the contractor is doing
unsatisfactory work.
c. "Liquidated damages" is the amount per day that a contractor owes for
completing the contract late

Document information

Uploaded on
November 26, 2024
Number of pages
25
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
114
Followers
5
Items
24387
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions