Preliminary Design Build - ANS -A variation of DB
Uses Designer (AE-1) for the RFP's Bridging Documents that are 20%-35% Design
Can include both Prescriptive & Performance Specs
Design Criteria Design-Build - ANS -A variation of DB
Includes parameters not solutions
Performance Based Requirements
Can be called Design-Build to Budget
What are Characteristics that lead to Design-Bid-Build? - ANS -Prescriptive Specs
Lowest Initial Price
Schedule is Less Important
Has no legal barriers
Open-Selection is Required
Factors to Consider When Making Decisions on Best Project Delivery Model to
Use
- ANS -Impact on Stakeholders
Market Conditions
Owner Profile
, Schedule Requirements
Ability to Make the Mental Shift
Characteristics That Lead to Design-Build ?
- ANS -Completion Time is Critical
Performance Based Requirements
Collaboration is Important
Flexibility of Approach
Characteristics of CMAR
- ANS -CONSTRUCTION MANAGER AT RISK [CMAR]
Prescriptive Specs
Early Constructor Involvement
Want Earlier Knowledge of Costs than DBB
Typically Faster than DBB
Reasons Why DB Projects Fail ?
- ANS -Includes FAILURE TO:
Achieve Trust
Set Clear Expectations of Responsibilities + Liabilities
Understand Quality, Cost and Schedule
Commit During Design Development
Three Tenants of Design Build (DB) ?
- ANS -SOURCE SELECTION: Picking the Right Team, QBS
EXAM STUDYGUIDE QUESTIONS AND CORRECT
ANSWERS | A+ GRADE
Preliminary Design Build - ANS -A variation of DB
Uses Designer (AE-1) for the RFP's Bridging Documents that are 20%-35% Design
Can include both Prescriptive & Performance Specs
Design Criteria Design-Build - ANS -A variation of DB
Includes parameters not solutions
Performance Based Requirements
Can be called Design-Build to Budget
What are Characteristics that lead to Design-Bid-Build? - ANS -Prescriptive Specs
Lowest Initial Price
Schedule is Less Important
Has no legal barriers
Open-Selection is Required
Factors to Consider When Making Decisions on Best Project Delivery Model to
Use
- ANS -Impact on Stakeholders
Market Conditions
Owner Profile
, Schedule Requirements
Ability to Make the Mental Shift
Characteristics That Lead to Design-Build ?
- ANS -Completion Time is Critical
Performance Based Requirements
Collaboration is Important
Flexibility of Approach
Characteristics of CMAR
- ANS -CONSTRUCTION MANAGER AT RISK [CMAR]
Prescriptive Specs
Early Constructor Involvement
Want Earlier Knowledge of Costs than DBB
Typically Faster than DBB
Reasons Why DB Projects Fail ?
- ANS -Includes FAILURE TO:
Achieve Trust
Set Clear Expectations of Responsibilities + Liabilities
Understand Quality, Cost and Schedule
Commit During Design Development
Three Tenants of Design Build (DB) ?
- ANS -SOURCE SELECTION: Picking the Right Team, QBS