• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 43 pages
Exam (elaborations)

PJM Transmission Exam Study Questions and Answers 100% Pass

Document preview thumbnail
Preview 4 out of 43 pages

PJM Transmission Exam Study Questions and Answers 100% Pass During System Restoration, what is the optimal Frequency Range? - ANSWER- 59.75 - 61 Hz The 500 kV system has normal bus voltages between? - ANSWER-500 to 550 kV When Connecting 2 islands, the operator must match? - ANSWER-Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - ANSWER-30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV When will PJM issue a Minimum Generation Alert? (how many MW under normal operating limits) - ANSWER-When expected generation levels fall within 2500 MW of normal operating limits When a thunderstorm is nearing the BES should auto-reclosing be turned on? - ANSWER-Yes What does SCADA stand for? - ANSWER-Supervisory Control & Data Acquisition Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/43 What does IROL stand for? - ANSWER-Interconnection Reliability Operating Limit What does eDART stand for? - ANSWER-Dispatcher Application and Reporting Tool What is eDART used for? (Electronic Disp Reporting Tool) - ANSWER-It is used for: Generation Outage Scheduling, Instantaneous Reserve Checks, Generator Reactive Capabilities and to enter and submit switching What direction do VARS flow? - ANSWER-From HIGH Voltage to LOW Voltage What direction do MW flow? - ANSWER-From HIGH Phase Angle to LOW Phase Angle Which of the following factors are NOT used in forecasting load? 1) Weather Forecast 2) Historical Load Forecast 3) Historical Weather Data 4) Locational Marginal Pricing (LMP) Data - ANSWER-4 What one-way communication system is used to disseminate info to local call centers? - ANSWER-All-Call The 3 categories of messages issued by PJM All-Call all EXCEPT: Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 3/43 1) Operational 2) Informational 3) Conflicting Interchange Values 4) Emergency Procedures - ANSWER-3 When should, transmission outages should be submitted to PJM to avoid cancellation and to be considered "on time?' - ANSWER-First day of Month Prior to the Outage What report will be requested by PJM when a Max Generation Alert is issued? - ANSWER-Supplementary Status Report (SSR) The loss of a large generation unit on the PJM system can be detected by monitoring: - ANSWER-Frequency and PJM Area Control Error (ACE) The PJM system is operated such that the contingency flow

Content preview

PJM Transmission Exam Study
Questions and Answers 100% Pass

During System Restoration, what is the optimal Frequency Range? - ANSWER✔✔-

59.75 - 61 Hz


The 500 kV system has normal bus voltages between? - ANSWER✔✔-500 to 550 kV


When Connecting 2 islands, the operator must match? - ANSWER✔✔-Voltage, Phase

Angle and Frequency


What are the Minimum Source Requirements for a 500kV line? (Gen/mile and

load/mile) - ANSWER✔✔-30 MW Gen/mile of energized 500 kV and 20 MW

Load/mile of energized 500 kV


When will PJM issue a Minimum Generation Alert? (how many MW under normal

operating limits) - ANSWER✔✔-When expected generation levels fall within 2500 MW

of normal operating limits


When a thunderstorm is nearing the BES should auto-reclosing be turned on? -

ANSWER✔✔-Yes


What does SCADA stand for? - ANSWER✔✔-Supervisory Control & Data Acquisition



Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 1/43

,What does IROL stand for? - ANSWER✔✔-Interconnection Reliability Operating Limit


What does eDART stand for? - ANSWER✔✔-Dispatcher Application and Reporting

Tool


What is eDART used for? (Electronic Disp Reporting Tool) - ANSWER✔✔-It is used for:

Generation Outage Scheduling, Instantaneous Reserve Checks, Generator Reactive

Capabilities and to enter and submit switching


What direction do VARS flow? - ANSWER✔✔-From HIGH Voltage to LOW Voltage


What direction do MW flow? - ANSWER✔✔-From HIGH Phase Angle to LOW Phase

Angle


Which of the following factors are NOT used in forecasting load?




1) Weather Forecast


2) Historical Load Forecast


3) Historical Weather Data


4) Locational Marginal Pricing (LMP) Data - ANSWER✔✔-4


What one-way communication system is used to disseminate info to local call centers? -

ANSWER✔✔-All-Call


The 3 categories of messages issued by PJM All-Call all EXCEPT:

Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 2/43

,1) Operational


2) Informational


3) Conflicting Interchange Values


4) Emergency Procedures - ANSWER✔✔-3


When should, transmission outages should be submitted to PJM to avoid cancellation

and to be considered "on time?' - ANSWER✔✔-First day of Month Prior to the Outage


What report will be requested by PJM when a Max Generation Alert is issued? -

ANSWER✔✔-Supplementary Status Report (SSR)


The loss of a large generation unit on the PJM system can be detected by monitoring: -

ANSWER✔✔-Frequency and PJM Area Control Error (ACE)


The PJM system is operated such that the contingency flow is less than the: -

ANSWER✔✔-Emergency Rating


When ordered a 5% voltage reduction should be taken on: - ANSWER✔✔-The

Distribution System


TOs are required to report "Hot Line Work" on what voltage levels? - ANSWER✔✔-345

kV and Above




Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 3/43

, Load dump rating of an EHV line is determined by? - ANSWER✔✔-115% of the

facility's 4 hour Emergency Rating


During System Restoration, will closing additional tie lines increase the strength &

stability of an interconnected area? - ANSWER✔✔-Yes


Which of the following factors influence load forecast (3)?




1) Weather


2) Temperature


3) Reactive Reserves


4) Day of the week - ANSWER✔✔-1, 2, 4


During system restoration, what is the voltage range the system should be kept

between? - ANSWER✔✔-90% and 105% maintain voltage profile between for system

restoration


PJM will coordinate and direct all restoration lines of what voltage levels? -

ANSWER✔✔-500kV and above


How much load would you dump to increase the frequency by 1 Hz (percentage

range)? - ANSWER✔✔-6-10%




Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 4/43

Document information

Uploaded on
November 19, 2024
Number of pages
43
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SophiaBennett
3.6
(29)
Sold
159
Followers
5
Items
9084
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions