SWM DEQ EXAM QUESTIONS NEWEST REAL QUESTIONS AND
CORRECT DETAILED ANSWERS (100% CORRECT VERIFIED
ANSWERS) |GUARANTEED PASS A+ (BRAND NEW!!)
The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - ANSWER: Virginia Stormwater Management Act,
Virginia Stormwater Management Program Regulation

VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are - ANSWER: greater than or equal to an acre

The Stormwater Management Act requires the State Water Control Board to -
ANSWER: permit, regulate, and control stormwater runoff

DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts
upon request - ANSWER: 90

The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - ANSWER: staff of a stormwater program,
anyone contracted by a VSMP authority, standard and specification holders

The dual certificate will expire three years from - ANSWER: the latest date of the
certificates

SWM plan must be approved by ___ before land disturbance - ANSWER: VSMP
program authority

The water quality criteria sets a site-based load limit of ____ of total phosphorus for
new development - ANSWER: 0.41 lbs/acre/year

The phosphorus load limit uses the - ANSWER: 10% impervious cover

Part II B and II C water quantity criteria addresses - ANSWER: channel protection and
flood protection

Which two plans in the SWPPP must be approved? - ANSWER: SWM plan, ESC plan

Does the SWM plan address runoff during or after construction? - ANSWER: post-
construction

What is the lower limit of the range of imperviousness that can result in stream
degradation? - ANSWER: 10%

What do land disturbing activities consist of? - ANSWER: excavating, clearing, grading

, LDA threshold for the SWM Act and Regulation - ANSWER: 1 acre or 2500 square
feet for Chesapeake Bay Preservation Act

In situations where an initial exemption was applicable because LDAs were related to
emergency work, VSMP authority shall be advised of the disturbance within -
ANSWER: 7 days of commencing the LDA and shall submit a permit application
within 30 days of starting the land-disturbing activity

Localities with MS4 - ANSWER: must adopt and administer a stormwater program

Localities without MS4 - ANSWER: may choose to administer a VSMP or have DEQ
administer the program

DEQ is responsible for enforcing the ____ while locality ____ are responsible for
enforcing local ordinances - ANSWER: Construction GP, VSMP

A locality VSMP authority must include enforcement authority and a schedule of civil
penalties for enforcement actions in its local ordinance. The maximum penalty the
authority may issue is - ANSWER: $32,500 per violation per day

Any civil penalty assessed by a court as a result of a summons issued by a locality
VSMP authority must be paid - ANSWER: into the locality's treasury

Any person who violates..... shall be subject to a civil penalty not to exceed -
ANSWER: $32, 500

Chesapeake Bay Preservation Areas that result in a land disturbance greater than or
equal to ____ and less than ____ - ANSWER: 2,500 ft^2, 1 acre

CBPA LDAs must have - ANSWER: approved E&SC plan, approved SWM plan, local
approval to start land disturbance, long-term maintenance agreement, construction
record drawings

CBPA LDAs do not require - ANSWER: Construction GP, Pollution prevention Plan,
Additional control measures to address TMDL

State entities and linear projects ___ submit a single set of standards and
specifications to DEQ for approval, federal entities ____ - ANSWER: must, may

Name the 5 steps in order of the permitting process - ANSWER: submittal of ESC
plans and SWM plans, SWM plan review and approval, registration statement entry
into Construction GP, Construction GP approved by DEQ, Locality VSMP authority
approval to start land disturbance

The locality VSMP authority has ___ days to determine the completeness of a
stormwater management plan and to notify the applicant of its determination -
ANSWER: 15

Connected book
 image
Charles H. Kraft SWM/SIS at Forty
Publisher: 2005 ISBN: 9780878083497 Edition: Unknown

Document information

Uploaded on
November 17, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
7
Followers
1
Items
1137
Last sold
4 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions