A project estimator is developing a cost estimate for construction of a new diagnostic
imaging wing. The following costs are estimated:



Fixed equipment installation cost is $700,000



Site preparation is $50,000



Utilities costs per year is $425,000



Construction material costs is $1,200,000



Portable equipment is $900,000



Annual depreciation is $275,000



What are the expected contractor costs? - ANSWER 1,600,000



Which of the following are components of common general contractor markups:



1. Permit and inspection fees



2. General conditions



3. Overhead and profit

,4. Site condition assessment fees - ANS 2, 3, and 4



Demand side management (DSM) programs are designed and offered to organizations
by energy providers to do which of the following during peak service? - ANS Provide
emergency energy demand sources



When designing a preventive maintenance program, a facility manager should attempt
to have an annual test run on each needed battery-powered lighting system. The test
should be run for NOT less than: - ANSWER 30 seconds



In existing facilities, doors which open onto exit corridors shall be 1-3/4 inch solid
bonded wood core or be of other construction that resists fire for NOT less than: -
ANSWER 20 minutes



Total dissolved solids in a cooling tower are maintained by: - ANSWER Variable speed
drive fans



Which of the following contract types requires there be a schedule of values used during
pricing? - ANSWER Guaranteed maximum price



A project has an approved budget of $6,600,000. The fees for planning and design are
forecasted at $700,000 and the construction costs are forecasted at $5,100,000. What is
the dollar value of a 10% construction contingency? - ANSWER 580,000



The Joint Commission requires an organization to develop and implement a policy that
prohibits smoking except in those circumstances that are specified. The intent of this
standard is to help reduce risks in regards to:



1. Possible adverse effects on care, treatment, and services to people who smoke



2. Passive smoke to others

, 3. Fire



4. False alarms - ANSWER 2, 3, and 4



An organization chooses to put in place and implements appropriate controls when
planning demolition, construction, or renovation to mitigate risk and minimize the
impact of these activities on infection control. Which are proper controls within the area
of actual construction:



1. Negative air machines



2. Dust barriers



3. Wet-mopping the floors



4. Job site free of debris - ANSWER 2, 3 and 4



A facility is installing an air intake for a medical air compressor. At what minimum
heights, in ft., should this be located above the ground? ANSWER 5



When load testing an Emergency Power Supply System, EPSS with a load bank since the
-required monthly test could not reach 30% of the name plate load rating, the minimum
duration of the test shall be: - ANSWER 30 minutes



The contractor close-out of a hospital construction project would include:



1. A punch list

Document information

Uploaded on
November 13, 2024
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Braxton
3.6
(16)
Sold
75
Followers
45
Items
2101
Last sold
2 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions