What would the requirements be for a new patient room door within a healthcare
occupancy? - ANSWER 45.5 inches wide & smoke tight
What are the general contractor responsibilities on a healthcare construction? -
ANSWER Operations manuals
Maintenance Manuals
Punch list
TAB Reports
Medical gas verification
What does a TAB report refer to? - ANSWER Testing Adjustment Balancing Report
What are generally NOT a contractor responsibility during healthcare construction? -
ANSWER Final cleaning
Training
What type of room require 2 total outdoor air changes? ANSWER Patient room
NICU
ICU
CCU
Airborne Infection Isolation Room
Protective environment room
Radiology waiting
, ED waiting
Triage
What type of rooms require 3 total outdoor air changes? ANSWER Procedure room
What type of rooms require 4 total outdoor air changes? ANSWER OR room
Delivery room
What type of rooms require 4 total air changes? ANSWER Patient room
What room type requires 6 total air changes? - ANSWER NICU
ICU
CCU
What room type requires 12 total air changes? - ANSWER Isolation room
Protective environment room
ED Waiting
Radiology waiting
Triage
What room type requires 20 total air changes? - ANSWER OR room
A patient room shall have how many total Outdoor ACH and how many total ACH? -
ANSWER 2 Total outdoor air changes
4 Total air changes
How many total Outdoor ACH and how many total ACH does an OR room require?
ANSWER 4 Total outdoor air changes
LATEST UPDATE
What would the requirements be for a new patient room door within a healthcare
occupancy? - ANSWER 45.5 inches wide & smoke tight
What are the general contractor responsibilities on a healthcare construction? -
ANSWER Operations manuals
Maintenance Manuals
Punch list
TAB Reports
Medical gas verification
What does a TAB report refer to? - ANSWER Testing Adjustment Balancing Report
What are generally NOT a contractor responsibility during healthcare construction? -
ANSWER Final cleaning
Training
What type of room require 2 total outdoor air changes? ANSWER Patient room
NICU
ICU
CCU
Airborne Infection Isolation Room
Protective environment room
Radiology waiting
, ED waiting
Triage
What type of rooms require 3 total outdoor air changes? ANSWER Procedure room
What type of rooms require 4 total outdoor air changes? ANSWER OR room
Delivery room
What type of rooms require 4 total air changes? ANSWER Patient room
What room type requires 6 total air changes? - ANSWER NICU
ICU
CCU
What room type requires 12 total air changes? - ANSWER Isolation room
Protective environment room
ED Waiting
Radiology waiting
Triage
What room type requires 20 total air changes? - ANSWER OR room
A patient room shall have how many total Outdoor ACH and how many total ACH? -
ANSWER 2 Total outdoor air changes
4 Total air changes
How many total Outdoor ACH and how many total ACH does an OR room require?
ANSWER 4 Total outdoor air changes