• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Dbia 3 Practice Test

Document preview thumbnail
Preview 2 out of 7 pages

DBIA 3 PRACTICE TEST ...

Content preview

DBIA 3 PRACTICE TEST


Post-Award - ANSWER The time from the Notice of Award to the end of the
warranty period


Notice of Award - ANSWER grants an opportunity to negotiate


Step One - ANSWER Celebrate!


Share the notice of award with everyone who participated in the proposal
process!


Good team building practice - ANSWER Include the Owner in your
celebration!


Step Two - ANSWER Assessment


Go slow in the planning To go fast in the execution


Design Validation - ANSWER The process of making sure the proposal and
project plan meets the Owner's Project Criteria, with no gaps.


Design Reconciliation - ANSWER he process of executing the plan &
completing design and construction in a way that keeps the completed project
within the project targets for value, cost, performance and constructability.

, During the time transition from proposal to project, - ANSWER Project
Partnering and Team Alignment initiatives should start.


Step Three: Execute Agreement - ANSWER Basis of Design" Documents
•Owner's Project Criteria
•Design-Builder's Proposal
•Deviation List


our collective successdepends on integrating different perspectivesinto a
comprehensive - ANSWER solution


The true measure of a teamis that it accomplishes the - ANSWER results sets
out to achieve


The Owner sets the - ANSWER tone for the project


Being good at construction management or project management will not -
ANSWER automatically make you good at Design-Build management


Owners know how to do Design-Bid-Build - ANSWER They have a comfort
level with tradition-Many have a tendency to "tweak" Design-Build to look
more like Design-Bid-Build•"Low Bid" to select the team•Dictating solution
through prescriptive design


Performance Monitors (Owner's Rep) - ANSWER On the front lines-Owner's
agents who routinely monitor Design-Build Team's performanceAssigned
specific areas of award fee responsibility (aligned with criteria)Must provide

Document information

Uploaded on
November 9, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
luzlinkuz
3.8
(331)
Sold
1621
Followers
852
Items
32695
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions