What must owners and operators do if their UST fails the internal lining inspection and cannot be repaired according to a code of practice? - ANSWERPermanently close the UST T/F Cathodic protection tester can design field-installed cathodic protection systems - ANSWERFalse T/F Owners and operators have 30 days to respond to an active alarm on their automatic tank gauging console. - ANSWERFalse T/F An inconclusive result for SIR means an owner and operator has not performed release detection for that month. - ANSWERTrue How many years must owners and operators maintain performance claims for their release detection method? - ANSWER5 Years Owners and operators with 100 or fewer USTs must have ____ dollars aggregate coverage for tanking corrective action and compensating third parties - ANSWER1 Million T/F Owners and operators may use a combination of financial mechanisms to comply with the financial responsibility requirements. - ANSWERTrue

Content preview

UST Designated Operator A CORRECT
100%
What must owners and operators do if their UST fails the internal lining inspection and cannot be
repaired according to a code of practice? - ANSWERPermanently close the UST



T/F Cathodic protection tester can design field-installed cathodic protection systems - ANSWERFalse



T/F Owners and operators have 30 days to respond to an active alarm on their automatic tank
gauging console. - ANSWERFalse



T/F An inconclusive result for SIR means an owner and operator has not performed release detection
for that month. - ANSWERTrue



How many years must owners and operators maintain performance claims for their release detection
method? - ANSWER5 Years



Owners and operators with 100 or fewer USTs must have ____ dollars aggregate coverage for tanking
corrective action and compensating third parties - ANSWER1 Million



T/F Owners and operators may use a combination of financial mechanisms to comply with the
financial responsibility requirements. - ANSWERTrue



T/F Tanks less than 10,000 gallons installed after April 11, 2016 do not have to meet the secondary
containment requirement. - ANSWERFalse



Select the equipment used in UST systems installed after October 13, 2015 where the first three-year
test or inspection must take place at installation. - ANSWERAutomatic shutoff devices, high level
alarms, and single-wall spell buckets receiving deliveries of more than 25 gallons installed after
October 13th, 2015 must have a first three-year test or inspection at installation.



Select the spill and overfill prevention equipment installed before October 13, 2015, where the first
three-year test or inspection must take place by October 13, 2018. - ANSWERAll of the equipment
shown requires the first three-year test or inspection

, Owners and operators must notify EPA at least 30 days prior to permanently closing an UST system or
performing a change-in-service by doing what? - ANSWERCall EPA

E-mail EPA

Mail by U.S Postal Service



Containment sumps include which of the following? - ANSWERUnder-Dispenser Containment

Submersible Turbine pump sump

Transition Sump



Owners and operators must demonstrate compatibility for which of the following stored substances?
- ANSWERB50

E15



T/F All components of UST systems are designed for all blends of ethanol in the fuel. - ANSWERFalse



T/F Double-walled spill buckets where the space between the walls of the spill bucket is no longer
monitored at least 30 days must be tested for liquid tightness within 1 year after monitoring ceases. -
ANSWERFalse



What percent of piping can an owner or operator repair and not have to replace the piping with
secondarily contained piping? - ANSWERLess than 50 percent



T/F Owners and operators need to check hand held release detection equipment for operability and
serviceability at least annually - ANSWERTrue



How often must owners and operators conduct containment sump testing for containment sumps
used for piping interstitial monitoring? - ANSWER3 years



T/F Manual tank gauging can be used to meet the release detection monitoring requirement for any
size tank. - ANSWERFalse



T/F Pressurized piping must use an automatic line leak detector. - ANSWERTrue

Document information

Uploaded on
November 8, 2024
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
papersbyjol
3.8
(79)
Sold
453
Followers
254
Items
14152
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions