Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

Law & Business (CSLB) Contracting exam with correct answers 2024

Document preview thumbnail
Preview 2 out of 12 pages

The contractor's license number correct answers The most important thing to include when advertising for construction work is Name, business address, and contractor's license number correct answers What must licensed plumbing, electrical sign and well-being contractors have displayed on both sides of their commercial truck? All of the above correct answers If you are advertising, in which of these locations is your license number required? Billboards Bus stop benches Yellow pages advertising all of the above White correct answers What color paint is normally used to mark an excavation area? Stop work immediately at the site, and notify the Coroner correct answers If, during excavation, you unearth human remains or burial artifacts at a construction site, what should you do? A contractor must have a license number to advertise correct answers Which statement is most correct? 1. All advertising must include the contractor's name, address and telephone number; 2. The address of the Contractor's State License Board must be on all advertising; 3. A contractor must have a license number to advertise; 4. A contractor's license number must be on all forms the company prints Profit correct answers Of the following four items to consider when bidding, which is the MOST important? 1. Overhead 2. Labor 3. Material 4. Profit Anticipated legal fees correct answers Which of the following would you NOT include in a bid? 1. Cost of performance bond 2. Labor and material 3. Profit 4. Anticipated legal fees

Content preview

Law & Business (CSLB) Contracting

The contractor's license number correct answers The most important thing
to include
when advertising for construction
work is
Name, business address, and contractor's license number correct answers
What must
licensed plumbing, electrical sign and well-being contractors have
displayed
sides on both
of their commercial
truck?
All of the above correct answers If you are advertising, in which of these
locations
your is number
license
required?
Billboard
s
Bus stop
benches
Yellow pages
advertising
all of the
above
White correct answers What color paint is normally used to mark an
excavation area?
Stop work immediately at the site, and notify the Coroner correct
answers If, during
excavation, you unearth human remains or burial artifacts at a
construction
should you site, what
do?
A contractor must have a license number to advertise correct answers Which
statement
is most
correct?
1. All advertising must include the contractor's name, address and
telephone
2. The addressnumber;
of the Contractor's State License Board must be on all
advertising;
3. A contractor must have a license number to
4. A contractor's license number must be on all forms the
advertise;
company prints
Profit correct answers Of the following four items to consider when bidding,
which is the
MOST
important?
1.
Overhead
2.
3.
Labor
Material
4.
Profit
Anticipated legal fees correct answers Which of the following would you NOT
include in
a
bid?
1. Cost of performance
bond
2. Labor and
material
3.
Profit
4. Anticipated legal
fees

, Overhead Costs correct answers When bidding on a home improvement
contract, a should include: material costs, labor cost, direct costs, permits,
contractor
profits and...
Assures the accuracy of cost estimates correct answers What is best
reason for
standardized
bidding?
Profits above 10% correct answers Which of the following would most likely
place
out of arange
bid from the other bids submitted
for a job?
The contractor is responsible to complete the work correct answers Your
bid on
was a job
accepted, but you inadvertently left out a part of that job., what
should
1. Writeyou do?
a change order and get it signed by the
owner
2. Add the additional cost to the end of the job and say
nothing
3. Do the omitted portion of the job on a time and
materials
4. basis is responsible to complete
The contractor
the work
Bidding against the competition and not the job correct answers What is
a common
pitfall in
bidding?
Lower your bid to match other offers correct answers What is not
recommended
are outbid by aiflower
you
bidder?
Negotiate with the owner to reduce the scope of the work correct answers A
contractor
is bidding on a project for a homeowner. The homeowner has included
several
items "extra"
upon which to bid. After receiving the bid, the homeowner says it is
too high
asks the andcontractor to lower the price. What should the
contractor do?
Stick close to your bid even if it means losing the job correct answers A
customer
wants to accept a bid but does not have enough money. A wise contract
decision would
be
to:
Inspect the job personally correct answers When bidding on a job, what is
the"assess
to best way the
job?"
1. Call the planning
department
2. Call the
architect
3. Call the
4. Inspect the job
owner
personally
There is nothing he can do to recover the
additional costs
(Overhead is not related to time and material) correct answers If a
contractor
written has a based on "time and material," what should be done to cover
contract
anoverhead
in increase
costs?
1. Add the cost to the customer's bill under the
material
2. Add the cost to the customer's bill
under
3. Timelabor
and material contracts are
inappropriate
4. There is nothing he can do to recover the
additional costs

Document information

Uploaded on
November 7, 2024
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
HopeJewels
3.6
(8)
Sold
97
Followers
11
Items
8854
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions