Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 37 pages
Exam (elaborations)

HCAD 325 Final Exam Questions and Answers

Document preview thumbnail
Preview 4 out of 37 pages

HCAD 325 Final Exam Questions and Answers

Content preview

HCAD 325 Final Exam




Jose is the supervisor of the laboratory. One of his testing machines seems to be giving different results
for the same sample. To make sure he is delivering correct results, Jose uses a second machine to check
the results of the first. This action represents which cost of quality type?



a. Prevention

b. Internal failure

c. Appraisal

d. External failure - Answer-c. Appraisal



Which of the following is not a common theme found in successful Six Sigma programs?



a. Top management support

b. Use of quantitative measures

c. Use of Taguchi methods

d. Team-based projects - Answer-c. Use of Taguchi methods



The term "Six Sigma" represents what goal?

,a. Six standard deviations from the median

b. 3.4 defects per million opportunities

c. Six defects per million opportunities

d. Sigma level quality - Answer-b. 3.4 defects per million opportunities



Jose, the lab manager, wants to improve the quality in his laboratory with a Six Sigma program. He
wants Sandy, his chemistry supervisor, to attend a Six Sigma training program so that she can oversee all
Six Sigma projects that will occur in the lab. Sandy will be trained as a ______________.



a. master black belt

b. yellow belt

c. green belt

d. black belt - Answer-d. black belt



What is the correct project cycle for a Six Sigma project?



a. Analyze, define, measure, improve, control

b. Measure, define, analyze, improve, control

c. Define, measure, analyze, improve, control

d. Define, improve, analyze, control - Answer-c. Define, measure, analyze, improve, control



What variables are measured in the measurement phase of a Six Sigma project?



a. Process duration, process variability, critical to quality

b. Process input, process output, process duration

c. Process input, process output, critical to quality

,d. Process error rate, process output, process duration - Answer-c. Process input, process output,
critical to quality



Which tool is not part of the analyze phase of a Six Sigma project?



a. Regression analysis

b. Gantt chart

c. Pie chart

d. Bar graph - Answer-b. Gantt chart



Jose is checking his laboratory equipment using test control samples that are designed to give the same
results and are used to calibrate the equipment. When he runs 100 samples, he gets two results that are
greater than 3 standard errors of the mean. These results are called what?



a. 2 sigma quality

b. Special variation

c. Error bars

d. Common variation - Answer-b. Special variation



Jose is measuring the time it takes a technician to do a new test. He expects the test to take no more
than 5 minutes and no less than 3 minutes. After observing a number of tests, he calculates the standard
deviation of the test as 0.3 minutes. What is the process capability of the test?



a. 0.0

b. 1.8

c. 1.1

d. 2.0 - Answer-c. 1.1

, Jose has a new test that has three steps. He calculates that in each step some of the sample must be
discarded. Step 1 has a discard rate of 2 percent, step 2 has a discard rate of 5 percent, and step 3 has a
discard rate of 1 percent. How much of the sample is available after step 3?



a. 82.0 percent

b. 75.5 percent

c. 86.5 percent

d. 99.1 percent - Answer-c. 86.5 percent



What is the primary goal of Lean?



a. Eliminate defects

b. Eliminate waste

c. Improve financial performance

d. Maximize employee productivity - Answer-b. Eliminate waste



Tiffany is the day shift supervisor in the imaging department. She has redesigned the patient intake
system so that patients are only asked their name and birthdate once. The old system asked the patient
this information three times. What type of waste did Tiffany reduce?



a. Waiting

b. Motion

c. Overproduction

d. Overprocessing - Answer-d. Overprocessing

Document information

Uploaded on
November 7, 2024
Number of pages
37
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$17.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Zanaya
4.5
(12)
Sold
78
Followers
29
Items
10176
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions