The law that set into place stormwater regulations in the 1970s is - correct answer-
b b b b b b b b b b b b bb b
The Clean Water Act
b b b
Regulations for managing stormwater activity on a construction site are outlined in
b b b b b b b b b b b
the - correct answer-NPDES
b b bb b
When should you read and understand your project stormwater pollution prevention
b b b b b b b b b b
plan - correct answer-Immediately after the project awarded and before you begin
b b bb b b b b b b b b b
any site work is
b b b b
Which of the following is not an allowable stormwater discharge or non-stormwater
b b b b b b b b b b b
discharge - correct answer-Discharges are contaminated groundwater
b b bb b b b b
Construction activity may begin - correct answer-When the jurisdiction of operation
b b b b bb b b b b b
specifies you can start
b b b b
Waters that sell anti-degration standards are placed on the _______ list - correct
b b b b b b b b b b b bb
answer-303D
b
SWPP certifications are signed by - correct answer-An officer of the project owner or
b b b b b bb b b b b b b b
an officer of the general contractor.
b b b b b b
TRUE OR FALSE: The document that must be completed signed and submitted to
b b b b b b b b b b b b
the state to obtain authorization to discharge is the NOT - correct answer-False
b b b b b b b b b b b bb b
The notice of termination can be filed when - correct answer-All construction inside
b b b b b b b b bb b b b
and outside of the building is completed and the final stabilization has been verified
b b b b b b b b b b b b b b
as complete
b b
Operators on a construction site are the entity in charge of plans and specifications
b b b b b b b b b b b b b
and the entity who is - correct answer-Is in charge of daily activities
b b b b b b bb b b b b b b
You should have a SWPPP for your construction site because (3 reasons) - correct
b b b b b b b b b b b b bb
answer-1. Its documents stormwater management
b b b b b b
2. Demonstrates your intent to manage stormwater on your site
b b b b b b b b b b
, 3. It is required by law
b b b b b
A well constructed SWPPP for your site should be - correct answer-Site specific
b b b b b b b b b bb b b
The NO must be submitted - correct answer-Prior to you commencing construction
b b b b b bb b b b b b
One necessary component of a good SWPPP is - correct answer-A schedule of
b b b b b b b b bb b b b
activities
b
Factors that may impact the SWPPP scheduling activities include - correct answer-
b b b b b b b b b bb b
Weather and climate b b
Pollutant sources on a construction site may include (3) - correct answer-1.
b b b b b b b b b bb b
petroleum storage tanks
b b b b
2. Masonry material
b b b
3. soil amendment
b b
The following considerations may be incorporatedd into SWPPP - correct answer-
b b b b b b b b bb b
Endangered species and historical preservation b b b b
If you beileve BMP modifications are necessary onsite you must, - correct answer-
b b b b b b b b b b bb b
Seek written approval of the project SWPPP designer and project owner
b b b b b b b b b b
The SWPPP will contain the following (3) - correct answer-1. Erosion and sediment
b b b b b b b bb b b b b
control bet management practices
b b b b b
2. A site specific sequence of construction activiites
b b b b b b b b
3. site maps
b b
Once a site has experienced a rain event of measurable quantity you must identify -
b b b b b b b b b b b b b b b
correct answer-Deficit and fialed BMP's and repair
b b b b b b b
The document that contains the permit number is - correct answer-The permit
b b b b b b b b bb b b
authorization letter
b b
The portion of the the SWPPP that specifies the content of the SWPPP is - correct
b b b b b b b b b b b b b b bb
answer-The table of contents
b b b b
The document in the SWPPP that certifies the GC's commitment to compliance with
b b b b b b b b b b b b
the SWPPP - correct answer-The SWPPP certification letter
b b b bb b b b b
The certifactions letter that identifies the name and contact information of
b b b b b b b b b b
subcontractors on the site is - correct answer-The subcontractors certification form
b b b b b b bb b b b b
The documents that reveal the total area of disturbance are - correct answer-The
b b b b b b b b b b bb b
site maps
b b
The document completed by the project SWPPP inspector recording site conditions
b b b b b b b b b b
during the inspection is - correct answer-The inspection report form
b b b b b bb b b b b
SOLUTIONS
The law that set into place stormwater regulations in the 1970s is - correct answer-
b b b b b b b b b b b b bb b
The Clean Water Act
b b b
Regulations for managing stormwater activity on a construction site are outlined in
b b b b b b b b b b b
the - correct answer-NPDES
b b bb b
When should you read and understand your project stormwater pollution prevention
b b b b b b b b b b
plan - correct answer-Immediately after the project awarded and before you begin
b b bb b b b b b b b b b
any site work is
b b b b
Which of the following is not an allowable stormwater discharge or non-stormwater
b b b b b b b b b b b
discharge - correct answer-Discharges are contaminated groundwater
b b bb b b b b
Construction activity may begin - correct answer-When the jurisdiction of operation
b b b b bb b b b b b
specifies you can start
b b b b
Waters that sell anti-degration standards are placed on the _______ list - correct
b b b b b b b b b b b bb
answer-303D
b
SWPP certifications are signed by - correct answer-An officer of the project owner or
b b b b b bb b b b b b b b
an officer of the general contractor.
b b b b b b
TRUE OR FALSE: The document that must be completed signed and submitted to
b b b b b b b b b b b b
the state to obtain authorization to discharge is the NOT - correct answer-False
b b b b b b b b b b b bb b
The notice of termination can be filed when - correct answer-All construction inside
b b b b b b b b bb b b b
and outside of the building is completed and the final stabilization has been verified
b b b b b b b b b b b b b b
as complete
b b
Operators on a construction site are the entity in charge of plans and specifications
b b b b b b b b b b b b b
and the entity who is - correct answer-Is in charge of daily activities
b b b b b b bb b b b b b b
You should have a SWPPP for your construction site because (3 reasons) - correct
b b b b b b b b b b b b bb
answer-1. Its documents stormwater management
b b b b b b
2. Demonstrates your intent to manage stormwater on your site
b b b b b b b b b b
, 3. It is required by law
b b b b b
A well constructed SWPPP for your site should be - correct answer-Site specific
b b b b b b b b b bb b b
The NO must be submitted - correct answer-Prior to you commencing construction
b b b b b bb b b b b b
One necessary component of a good SWPPP is - correct answer-A schedule of
b b b b b b b b bb b b b
activities
b
Factors that may impact the SWPPP scheduling activities include - correct answer-
b b b b b b b b b bb b
Weather and climate b b
Pollutant sources on a construction site may include (3) - correct answer-1.
b b b b b b b b b bb b
petroleum storage tanks
b b b b
2. Masonry material
b b b
3. soil amendment
b b
The following considerations may be incorporatedd into SWPPP - correct answer-
b b b b b b b b bb b
Endangered species and historical preservation b b b b
If you beileve BMP modifications are necessary onsite you must, - correct answer-
b b b b b b b b b b bb b
Seek written approval of the project SWPPP designer and project owner
b b b b b b b b b b
The SWPPP will contain the following (3) - correct answer-1. Erosion and sediment
b b b b b b b bb b b b b
control bet management practices
b b b b b
2. A site specific sequence of construction activiites
b b b b b b b b
3. site maps
b b
Once a site has experienced a rain event of measurable quantity you must identify -
b b b b b b b b b b b b b b b
correct answer-Deficit and fialed BMP's and repair
b b b b b b b
The document that contains the permit number is - correct answer-The permit
b b b b b b b b bb b b
authorization letter
b b
The portion of the the SWPPP that specifies the content of the SWPPP is - correct
b b b b b b b b b b b b b b bb
answer-The table of contents
b b b b
The document in the SWPPP that certifies the GC's commitment to compliance with
b b b b b b b b b b b b
the SWPPP - correct answer-The SWPPP certification letter
b b b bb b b b b
The certifactions letter that identifies the name and contact information of
b b b b b b b b b b
subcontractors on the site is - correct answer-The subcontractors certification form
b b b b b b bb b b b b
The documents that reveal the total area of disturbance are - correct answer-The
b b b b b b b b b b bb b
site maps
b b
The document completed by the project SWPPP inspector recording site conditions
b b b b b b b b b b
during the inspection is - correct answer-The inspection report form