Pearson Edexcel International Advanced Level Accounting International
Advanced Level PAPER 2: Corporate and Management Accounting QP
MAY 2024
[Author name] [Date] [Course title]
, Please check the examination details below before entering your candidate information
Candidate surname Other names
Centre Number Candidate Number
Pearson Edexcel International Advanced Level
Friday 24 May 2024
reference WAC12/01
Afternoon (Time: 3 hours) Paper
Accounting
International Advanced Level
PAPER 2: Corporate and Management Accounting
You must have: Total Marks
Source Booklet (enclosed)
Pearson Edexcel International Advanced Level Accounting International Advanced Level
PAPER 2: Corporate and Management Accounting QP MAY 2024
Instructions
• Use black ink or ball-point pen.
• Fill in the boxes at the top of this page with your name,
• centre number and candidate number.
• Answer both questions in Section A and three questions from Section B.
• All calculations must be shown.
Answer the questions in the spaces provided
• – there may be more space than you need.
Do not return the Source Booklet with the question paper.
Information
• The total mark for this paper is 200.
• The marks for each question are shown in brackets
• – use this as a guide as to how much time to spend on each question.
• Calculators may be used.
The source material for use with Questions 1 to 6 is in the enclosed Source Booklet.
Advice
• Read each question carefully before you start to answer it.
• Check your answers if you have time at the end.
Turn over
P75883A
©2024 Pearson Education Ltd.
*P75883A0140*
F:1/1/1/1/1
, SECTION A
Answer BOTH questions in this section. Write your answers in the spaces provided.
DO NOT WRITE IN THIS AREA
Source material for Question 1 is on pages 2 and 3 of the Source Booklet.
1 Prepare the following budgets for each of the three months from July to
September 2024 for PH plc.
(a) (i) Purchases budget, in litres.
(3)
Purchases in litres
July August September
Chemical X
Chemical Y
Water
DO NOT WRITE IN THIS AREA
Workings
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
DO NOT WRITE IN THIS AREA
....................................................................................................................................................................................................................................................................................
2
*P75883A0240*
, (ii) Purchases budget, in pounds (£).
(6)
DO NOT WRITE IN THIS AREA
Purchases in pounds (£)
July August September
Chemical X
Chemical Y
Water
Total
Workings
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
DO NOT WRITE IN THIS AREA
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
(b) Prepare the Trade Payables budget, in pounds (£), showing the amount owed to
suppliers at the end of each of the three months July to September 2024.
(4)
Trade Payables in pounds (£)
July August September
Chemical Y
Water
Total
DO NOT WRITE IN THIS AREA
Workings
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
3
Advanced Level PAPER 2: Corporate and Management Accounting QP
MAY 2024
[Author name] [Date] [Course title]
, Please check the examination details below before entering your candidate information
Candidate surname Other names
Centre Number Candidate Number
Pearson Edexcel International Advanced Level
Friday 24 May 2024
reference WAC12/01
Afternoon (Time: 3 hours) Paper
Accounting
International Advanced Level
PAPER 2: Corporate and Management Accounting
You must have: Total Marks
Source Booklet (enclosed)
Pearson Edexcel International Advanced Level Accounting International Advanced Level
PAPER 2: Corporate and Management Accounting QP MAY 2024
Instructions
• Use black ink or ball-point pen.
• Fill in the boxes at the top of this page with your name,
• centre number and candidate number.
• Answer both questions in Section A and three questions from Section B.
• All calculations must be shown.
Answer the questions in the spaces provided
• – there may be more space than you need.
Do not return the Source Booklet with the question paper.
Information
• The total mark for this paper is 200.
• The marks for each question are shown in brackets
• – use this as a guide as to how much time to spend on each question.
• Calculators may be used.
The source material for use with Questions 1 to 6 is in the enclosed Source Booklet.
Advice
• Read each question carefully before you start to answer it.
• Check your answers if you have time at the end.
Turn over
P75883A
©2024 Pearson Education Ltd.
*P75883A0140*
F:1/1/1/1/1
, SECTION A
Answer BOTH questions in this section. Write your answers in the spaces provided.
DO NOT WRITE IN THIS AREA
Source material for Question 1 is on pages 2 and 3 of the Source Booklet.
1 Prepare the following budgets for each of the three months from July to
September 2024 for PH plc.
(a) (i) Purchases budget, in litres.
(3)
Purchases in litres
July August September
Chemical X
Chemical Y
Water
DO NOT WRITE IN THIS AREA
Workings
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
DO NOT WRITE IN THIS AREA
....................................................................................................................................................................................................................................................................................
2
*P75883A0240*
, (ii) Purchases budget, in pounds (£).
(6)
DO NOT WRITE IN THIS AREA
Purchases in pounds (£)
July August September
Chemical X
Chemical Y
Water
Total
Workings
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
DO NOT WRITE IN THIS AREA
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
(b) Prepare the Trade Payables budget, in pounds (£), showing the amount owed to
suppliers at the end of each of the three months July to September 2024.
(4)
Trade Payables in pounds (£)
July August September
Chemical Y
Water
Total
DO NOT WRITE IN THIS AREA
Workings
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................................................................
3