100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Concrete Batch Plant Operator Exam(FDOT) TEST QUESTIONS AND ANSWERS VERIFIED LATEST UPDATE

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
04-11-2024
Written in
2024/2025

Concrete Batch Plant Operator Exam(FDOT) TEST QUESTIONS AND ANSWERS VERIFIED LATEST UPDATE Stockpiles of aggregate shall be maintained in a well-drained condition in order to: - Answer- Minimize Free Water Content Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch for FDOT? - Answer- 24 Free moisture of the aggregate means: - Answer- Moister on the surface of an aggregate that is above and beyond the absorbed moister in the aggregate. If the moister test is done other than by the cook-out method, how often shall the other methods be verified? - Answer- Each week For drill shaft concrete, the quantity of cement replaced with fly ash shall be: - Answer- 33 thru 37% In concrete, which material has a specific gravity of one? - Answer- Water

Show more Read less
Institution
Concrete Batch Plant Operator
Course
Concrete Batch Plant Operator








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Concrete Batch Plant Operator
Course
Concrete Batch Plant Operator

Document information

Uploaded on
November 4, 2024
Number of pages
4
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Concrete Batch Plant Operator Exam(FDOT)
TEST QUESTIONS AND ANSWERS VERIFIED
LATEST UPDATE
Stockpiles of aggregate shall be maintained in a well-drained condition in order to: -
Answer- Minimize Free Water Content

Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch
for FDOT? - Answer- 24

Free moisture of the aggregate means: - Answer- Moister on the surface of an
aggregate that is above and beyond the absorbed moister in the aggregate.

If the moister test is done other than by the cook-out method, how often shall the other
methods be verified? - Answer- Each week

For drill shaft concrete, the quantity of cement replaced with fly ash shall be: - Answer-
33 thru 37%

In concrete, which material has a specific gravity of one? - Answer- Water

What is the air content range for all classes of structural concrete except Class IV
Shaft? - Answer- 1.00 thru 6.00%

When can unmetered water be added to the concrete? - Answer- Not at all.

Do not allow the total number of revolution at mixing speed to exceed: - Answer- 160
Revolutions

After all materials have been charged into the transit mixer drum, the concrete must be
mixed at how many revolutions at the plant before leaving for the project? - Answer- 70
to 100

When the water meters / scales are calibrated, prior to production, at what frequency
should they be checked there after? - Answer- 3 moths

To what accuracy should the scales for weighing cement , pozzolan, slag and
aggregates at the plant be maintained - Answer- 0.5% of maximum load normally
handled

For concrete containing a water-reducing retarding admixture, in an agitator truck, the
maximum time for depositing the concrete shall not exceed: - Answer- 90 minutes

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ApassExams Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
29
Member since
2 year
Number of followers
10
Documents
1710
Last sold
4 months ago
Nursing Perfection Study Station

Just For You...Yes You....EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology, Nursing, Human resource Management and Mathematics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why I'm one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work

3.0

2 reviews

5
1
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions